Laserfiche WebLink
Executive Order VR-101-A, Exnibit 2, Page 3 <br /> Figure 2B <br /> Maintenance Instructions For Phil-Tate System Components <br /> Component Maintenance - <br /> Product Spill Containment Bucket Semi-Annually: Clean entire bucket and remove <br /> drain valve. Inspect all seals and replace <br /> components as needed. Upon completion, make <br /> sure bucket, valve, handle, and filter are properly <br /> aligned and adjusted. <br /> Vapor Spill Containment Bucket Routinely clean and inspect bucket quarterly. <br /> Rotatable Vapor and Product Adaptors Not Field Serviceable <br /> eign objects <br /> PressureNacuum Vent Valve without removing the PN Vent from nually inspect the P/V Vent for rthe vent pipe by <br /> using the following procedure: <br /> 1. Remove the screws that hold the top cover on. <br /> 2. Remove any debris that might be sitting inside <br /> the lower cover. <br /> 3. Check the drain holes in the lower cover for <br /> blockage. <br /> 4. The two(2)screens should not be removed. <br /> 5. Reinstall the top cover and retaining screws. <br /> 6. Tighten the screws firmly. <br /> Each gasoline dispensing facility operator/owner shall keep a maintenance log on-site. <br />