My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2002 - 2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
1331
>
2300 - Underground Storage Tank Program
>
PR0231332
>
COMPLIANCE INFO 2002 - 2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2019 2:07:54 PM
Creation date
12/4/2018 11:32:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002 - 2005
RECORD_ID
PR0231332
PE
2361
FACILITY_ID
FA0003961
FACILITY_NAME
LODI MUNI SERVICE CENTER
STREET_NUMBER
1331
Direction
S
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03104050
CURRENT_STATUS
01
SITE_LOCATION
1331 S HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
` MONITOK&NG SYSTEM CERTIFICAAN <br /> For Use By All Jurisdictions Within:the State of California <br /> Authority Cited: Chapter 6.7, Health and Safety Code; Chapter 16, Division 3, Title 23, California Code of Regulations <br /> This form must be used to document testing and servicing of monitoring equipment. If more than one monitoring system control <br /> panel is installed at the facility, a separate certification or report must be prepared for each monitoring system control panel by <br /> the technician who performs the work. A copy of this form must be provided to the tank system owner/operator. The <br /> owner/operator must submit a copy of this form to the local agency regulating UST systems within 30 days of test date. <br /> Instructions are printed on the back of this page. <br /> A. General Information <br /> Facility Name: L I `T _F Q)r* L_ I Bldg.No.: <br /> Site Address: 133 t 6. N\ City: Loci Zip: a52N 1 <br /> Facility Contact Person: Q—SNI Nu'S l'�L.(,4 14"-t►n.1 Contact Phone No.:(—) <br /> Make/Model of Monitoring System: Date of Testing/Servicing: <br /> B. Inventory of Equipment Tested/Certified <br /> Check the appropriate boxes to indicatespecific equipment inspected/serviced: <br /> Tank ID: t-4 5C 00 D 1 S Tank ID:s'1 — 1PL C) o 01 L <br /> ❑ In-Tank Gauging Probe. Model: ❑ In-Tank Gauging Probe. Model: <br /> Annular Space or Vault Sensor. Model: 1~- I Annular Space or Vault Sensor. Model: LALS� t <br /> Piping Sump/Trench Sensor(s). Model: L.b L-6--1 Piping Sump/Trench Sensor(s). Model: LS" <br /> ❑ Fill Sump Sensor(s). Model: ❑ Fill Sump Sensor(s). Model: <br /> Mechanical Line Leak Detector. Model:"Z�t��.G�tet�-� Mechanical Line Leak Detector. Model: 19D Wr 061> <br /> ❑ Electronic Line Leak Detector. Model: ❑ Electronic Line Leak Detector. Model: <br /> ❑ Tank Overfill/High-Level Sensor. Model: ❑ Tank Overfill/High-Level Sensor. Model: <br /> ❑ Dispenser Containment Sensor(s). Model: ❑ Dispenser Containment Sensor(s). Model: <br /> Shear Valve(s). Shear Valve(s). <br /> ❑ Dispenser Containment Float(s)and Chain(s). ❑ Dispenser Containment Float(s)and Chain(s). <br /> ❑ Other(specify equipment a and model in Section E on Page 2). ❑ Other(s ecifv equipment a and model in Section E on Page 2). <br /> Tank ID: Ii-'; y"LYE A;SZ) Tank ID: a H 1.J46-M DI L, <br /> ❑ In-Tank Gauging Probe. Model: ❑ In-Tank Gauging Probe. Model: <br /> Annular Space or Vault Sensor. Model: ❑ Annular Space or Vault Sensor. Model: <br /> Piping Sump/Trench Sensor(s). Model: `91 Piping Sump/Trench Sensor(s). Model: "1 <br /> ❑ Fill Sump Sensor(s). Model: ❑ Fill Sump Sensor(s). Model: <br /> Mechanical Line Leak Detector. Model: a-0 ❑ Mechanical Line Leak Detector. Model: <br /> ❑ Electronic Line Leak Detector. Model: ❑ Electronic Line Leak Detector. Model: <br /> ❑ Tank Overfill/High-Level Sensor. Model: ❑ Tank Overfill/High-Level Sensor. `todel: <br /> ❑ Dispenser Containment Sensor(s). Model: ❑ Dispenser Containment Sensor(s). Model: <br /> Shear Valve(s). ❑ Shear Valve(s). <br /> ❑ Dispenser Containment Float(s)and Chain(s). ❑ Dispenser Containment Float(s)and Chain(s). <br /> ❑ Other(specify equipment a and model in Section E on Page 2). 1 ❑ Other(specifv equipment type and model in Section E on Page 2). <br /> C. Certification — 1 certify that the equipment identified in this document was inspected/serviced in accordance with the manufacturers' <br /> guidelines. Attached to this Certification is information (e.g. manufacturers'checklists)necessary to verily that this information is correct <br /> and a Site Plan showing the layout of monitoring equipment. For any equipment capable ofgenerating such reports, 1 have also attached <br /> a copy of the(check all that apply): System set-up report; Alarm history repot <br /> Technician Name(print):1W t 1 t 1 I�.N� lA'MP��i.L Cert./Lic. No.:QO-I Signature:W (( <br /> Testing Company Name: �..�- 1' + llo-X< 113kbTT w ;I Phone No.: (I= 4.%_1�• ��� <br /> Page 1 of 3 05100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.