Laserfiche WebLink
G I TY QF LOR I <br /> FUEL- TANK 0ATHOI3 I C F—F:ZCTECT I ON F::zECQFRD <br /> DATE: j <br /> ` 7 7- q3 <br /> ----------------------- TIME: 1 � ' <br /> ---------------------- <br /> LOCATION: <br /> -- ----------------------------------------- <br /> TANK NO. OR NAME: It e ,;:?A I li <br /> VOLT READING: <br /> ------------------------------------------------- <br /> DIAGRAM OF TEST LOCATION: <br /> 2,5 <br /> MONITORING INSTRUCTIONS FOR sti-P3 TANK PROTECTION <br /> 1. Con nec!neganve pole of avoil meter la ihif 4. Meter should read more ne4ative than-gyp <br /> PP201sst terminal. millivolts or -am volts. This voltage VOLTMETER <br /> reading indicates the tank is properly <br /> 2. Connect posdrve pole to a copper/copper protected. PP20 TERMftV/1L <br /> sulfate half cell reference electrode.This <br /> reference electrode is an integral part of ;�?-� •'?:� <br /> voltmeters such as T l R-CPV-2.CPV-4, S. This reading Should be taken within 1 <br /> or ESD#500 CP which are available from year after installation and every five years <br /> your sty-P,e licensed tank manufacturer. thereafter for the life of the installation. \ \ SOIL <br /> 3. Remove the protection cap from the base <br /> of the reference electrode and place the \ �� TAW <br /> faase on the earth around the tank. 6. If the voltage level fans below-.0.5 volts` <br /> Typicelly,Bann can be contacted thru the contact the Steel Tank Institute dr your <br /> submersible pump or fill manhole, local sti-P,e supplier. PP2S MOUNTING <br /> LUG IMO WIRE LEAD ' <br /> Steel Tank Institute <br /> TECHNICIAN '' ` <br />