Laserfiche WebLink
SWRCB, January 2002 Page—of <br /> SECONDARY PIPE TESTLNG <br /> Test Method Developed By: 1 Piping Manufacturer dustry Standard Professional Engineer <br /> 9per(Specify) <br /> Test Method Used: Pressure :1 Vacuum 0 Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> PRK Run 4 <br /> Piping Piping Run Piping Run # <br /> Piping Run 4 <br /> Piping Nfaterial: <br /> Piping Manufacturer: <br /> Piping Diameter: <br /> Length of Piping Run: 7 ;7 <br /> Product Stored: & <br /> Method and location of <br /> moing-run isolation: <br /> Wait time between applying <br /> pressurelvacuum/water and X11-4 /'7 <br /> s=ing test: <br /> Test Start Time: <br /> Initial Reading(&): -./-, <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-Rt): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> TestResWt-. E4ass O-iail 0 Pass: 'El Fail r--j Pass LFant' 0. Pam. O:FAfl— <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />