Laserfiche WebLink
SWRCB, January 2002 Page of <br /> 7. FILL RISER CONTALNMENT SUMP TESTING. <br /> Facility is Not Equip2ed With Fill Riser Containment Sums C <br /> Fill Riser Containment Sumps are Present, but were Not Tested _ <br /> Test Method Developed By: C Sump Manufacturer - Industry Standard Professional Engineer <br /> Other(Specify) <br /> Test Method Used: C Pressure :1 Vacuum C Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Sump# Fill Sump# Fill Sump # ( Fill Sump#:; <br /> nSump Diameter: j <br /> Sump Depth: <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest j <br /> Electrical Penetration: <br /> Condition of sump prior to <br /> test" <br /> Portion of Sump Tested <br /> Sump Material: <br /> Wait time between applying ! <br /> pressure/vacuun/water and I ' <br /> starting test: I ! <br /> Test Start Time: i <br /> Initial Reading R4): ! <br /> Test End Time: C j <br /> Final Reading ): I <br /> Test Duration- <br /> Change <br /> uration-Chan a in Reading(RF-Rs): <br /> Pass/Fail Threshold or Criteria: j <br /> Test Restdt C:-Pass C Fail i 7:Pass Q.Fail k 0 Pass G Fail D. Pass Q Fail <br /> Is there a sensor in the sump? C Yes Q No j ❑Yes C No Yes C No C Yes i;No <br /> Does the sensor alarm when j <br /> either product or water is C Yes C No C NA i C Yes C No CNA ! C Yes No NA C Yes No NA <br /> detected? ` <br /> Was sensor removed for testing? C Yes ]NO r NA IC Yes .0 No ]-,NA j C Yes C No --,NA ❑Yes -No C NA <br /> Was sensor properly replaced and n yes C No �NA j C Yes i:1 No C NA j =Yes No CNA C Yes C No NA <br /> verified functional"after testing? I j <br /> Comments— (ntclude information on repairs made prior to testing, and recommended follow-ttD for failed tests) <br />