My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2002 TANK TOP UPGRADE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
1331
>
2300 - Underground Storage Tank Program
>
PR0231332
>
COMPLIANCE INFO 2002 TANK TOP UPGRADE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2019 2:35:21 PM
Creation date
12/4/2018 2:26:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002 TANK TOP UPGRADE
RECORD_ID
PR0231332
PE
2361
FACILITY_ID
FA0003961
FACILITY_NAME
LODI MUNI SERVICE CENTER
STREET_NUMBER
1331
Direction
S
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03104050
CURRENT_STATUS
01
SITE_LOCATION
1331 S HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RETROFIT OR REPAIR <br /> 1. SITE MAP ENCLOSED WITH EQUIPMENT SHOWN/SPECIFIED. YES [ NO [] <br /> 2. DESCRIPTION OF WORK TO BE COMPETED: <br /> Existing 2,000 gallon regular gasoline underground storage tank to be converted <br /> to unleaded fuel and tied into existing Perkins Welding Sti-P3 double wall steel <br /> 10,000 gallon underground storage tank via new siphon piping. Pump is to be <br /> removed from 2,000 gallon tank, and a jumper line for vapor recovery will be <br /> added. Existing piping from 2,000 gallon tank to current dispenser will be <br /> removed. Existing pump on 10,000 gallon tank will be retrofitted or replaced <br /> with siphon initiator. In addition, current dispensers will be replaced with new <br /> gasoline and diesel dispenser equipment. (Please see #3). <br /> 3. DESCRIPTION OF EQUIPMENT TO BE USED: <br /> Dispenser and Control Box: Wayne V389 <br /> Gasoline Stage II VR Hose Package: Emco Vapor Recovery A4005-002 <br /> Diesel Hose Package: Emco Wheaton A2000-142 <br /> Dispenser Sump: Model to be determined by contractor <br /> Gasboy Fuel Management System <br /> 4. ALL EQUIPMENT IS STATE CERTIFIED OR APPROVED. YES 4Q NO [] <br />
The URL can be used to link to this page
Your browser does not support the video tag.