Laserfiche WebLink
Project Location / 3 <br />BACKFILL EXCAVATION CERTIFICATE <br />OwnerC, :,-,, &F "Dot / v 'lliJ!_Gi ,D,!1 -C_ c �� CT/C Phone No. '2pq— 3 33 <br />Conuactor`aT ,U. /=57 !q 6. T(, Phone License No.36q/0,,5_ <br />INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br />. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br />✓ 2. Submission of verification, e.g., load ticket, within 30 days of project completion that one of the following materials was <br />placed in the excavation in 12' lifts: <br />Pea gravel --smooth, rounded material not more than one-half (1/2) inch in diameter <br />B. Crushed rock--self-compacting material not more than three-quarters (3/4) inch in cross sectional <br />measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between the <br />backfill material and tanks/pipes made of poly resin glass or similar materials.) <br />DECLARATION <br />I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of pproject completion, or submission of <br />verification that the select material described above will be placed at a minimum of five (5) cubic yards per 1000 gallon tank <br />displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br />Appendix Chapter 70. <br />* �1 l i(_� f=Lf52s s <br />g7 <br />Name(Print) <br />t <br />gnature <br />* Shall be the responsible managing employee on the license or authorized agent. <br />