Laserfiche WebLink
OCT-25-2007 17:52 CITY OF LODI 209 333 6710 P.02 <br /> CITY COUNCIL CITY O F LODI BLAIR KING, <br /> BOB JOHNSON, Mayor City Manager <br /> JOANNE MOUNCE, PUBLIC WORKS DEPARTMENT <br /> Mayor Pro Tempore City C JOHL, <br /> LARRY D. HANSEN CITY HALL, 221 WEST PINE STREET / P.O. BOX 3006 City Clerk <br /> LODI, CALIFORNIA 95241-1910 <br /> SUSAN HITCHCOCK TELEPHONE (209) 333-6706 / FAX (209) 333-6710 D. STEPHEN SCHWABAUER, <br /> PHIL KATZAKIAN EMAIL pwdept@lodi.gov City Attorney <br /> http://www.lodi.gov RICHARD C_ PRIMA, JR., <br /> Public Works Director <br /> October 25, 2007 <br /> Mr. Toua Yang <br /> Environmental Health Specialist <br /> San Joaquin County Environmental Health Department <br /> 600 E. Main Street <br /> Stockton, CA. 95202-3209 <br /> SUBJECT: Follow-up to Underground Storage Tank (UST) Program inspection Report, <br /> Dated 9/28/07, for City of Lodi Municipal Service Center, 1331 S. Ham Lane <br /> Your routine inspection of the City of Lodi's Underground Storage Tanks(UST's) and <br /> Annual Monitoring Certification noted two corrections that needed to be made. <br /> Enclosed please find the required follow-up paperwork showing compliance with your <br /> report's two items: Line No. 2, that secondary containment testing needed to be <br /> performed on the diesel STP (turbine) sump six (6) months after installation; and Line <br /> No. 5, that the UST Monitoring and Response Plan should be updated. <br /> When you were on-site for the inspection, I requested that you clarify whether a six- <br /> month follow up secondary containment test was considered necessary for the diesel <br /> sump that had been installed and tested in February 2007, since it was not listed as a <br /> condition of the permit for that work_ You responded (after checking with your supervisor) <br /> through your inspection report that it needed to be done. JP Petroleum Service was <br /> immediately scheduled to perform the work. A week later, on October 5, 2007, the diesel <br /> sump and piping were tested and passed. A copy of the Secondary Containment Testing <br /> Report Form is enclosed. <br /> When you were on-site, we also reviewed the Monitoring and Response Plan; I <br /> appreciate your helpfulness in discussing the corrections you thought were needed. <br /> Enclosed please find the updated Monitoring and Response Plan. Please review and <br /> return to me an approved copy, or note any additional changes you require. <br /> Also enclosed is the signed and completed "Return to Compliance Certification' form <br /> that you indicated must be part of our response. <br /> Cnooeuments and Sattingskieallahsn1Local Settingo\Temporary Internet F0w\0LK3ILSJHeaMh102507.doc <br />