Laserfiche WebLink
F. Iu-hank Ganging/SIR Eq Hent: leek this box if tan, icing is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Coni Mete tIL-p- 'ollowing checklist: - <br /> ❑ Yes ❑ N04' Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> WYesJWas accuracy of system product level readings tested? <br /> Was accuracy of system water level readings tested'? <br /> Were all probes reinstalled properly? <br /> Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): leek this box if LLDs are not installed. <br /> CMete the followin checklist: <br /> A1 <br /> : <br /> Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all Mai npphy) Simulated leak rate: ❑ 3 g.p.h.; ❑0.1 g.p.h ; ❑ 0.2 g.p.h. <br /> r <br /> ,Yes ❑ No* I Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes ❑ No* Was the testing apparatus properly calibrated? <br /> Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ <br /> N/A <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> N/A or disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> N/A malfunctions or fails a test? <br /> ❑ es ❑ .No* For electronic LLDs, have all accessible wiring connections been visually inspected? <br /> N/A <br /> 1,0 Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: I��J _ (� � j�Ff?d <br /> Page 3 of 3 <br /> 03i01 <br />