Laserfiche WebLink
OCT-25-2007 17:53 CITY OF LODI 209 333 6710 P.05 <br /> S'W`RC1I, January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer ❑ Industry Standard L Professional.Engineer <br /> ❑Other(Spec) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: ,pressure Gauge Equipment Resolution: 0-15 PSI <br /> Piping Run#1 Piping Run# Piping Run# Piping Run# <br /> Piping Material: Fiberglass <br /> Piping Manufacturer. Smith <br /> Piping Diameter: 3" <br /> Length of Piping Run: 20' <br /> Product Stored: Diesel <br /> Method and location of Test boot Test boot Test boot Test boot <br /> _gip_ -run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min- 5 rain 5 min 5 mug <br /> test: <br /> i <br /> 'fest Start Time: 8:45 <br /> Initial heading(RI), 5 PSI <br /> Test End Time: 9:45 <br /> Final Reading(RF): 5 PSI <br /> Test Duration: 1 Hour 30 min 30 min 30 min <br /> Change in Reading(RF-&): 0 <br /> Pass/Fail Threshold or 0 dr 0 drop 0 drop 0 drop <br /> Criteria: <br /> Test Result: z Pass 0 Fail ❑ Pass ❑Fail 0 Pass ❑Fail ❑ Pass ❑Fail . <br /> Comments— (include information on repairs made prior to testing, and recam ended follow-up for foiled tests) <br />