My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006 - 2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
1331
>
2300 - Underground Storage Tank Program
>
PR0231332
>
COMPLIANCE INFO 2006 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2019 4:07:20 PM
Creation date
12/5/2018 9:18:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2010
RECORD_ID
PR0231332
PE
2361
FACILITY_ID
FA0003961
FACILITY_NAME
LODI MUNI SERVICE CENTER
STREET_NUMBER
1331
Direction
S
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03104050
CURRENT_STATUS
01
SITE_LOCATION
1331 S HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OCT-25-2007 17:53 CITY OF LODI 209 333 6710 P.05 <br /> S'W`RC1I, January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer ❑ Industry Standard L Professional.Engineer <br /> ❑Other(Spec) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: ,pressure Gauge Equipment Resolution: 0-15 PSI <br /> Piping Run#1 Piping Run# Piping Run# Piping Run# <br /> Piping Material: Fiberglass <br /> Piping Manufacturer. Smith <br /> Piping Diameter: 3" <br /> Length of Piping Run: 20' <br /> Product Stored: Diesel <br /> Method and location of Test boot Test boot Test boot Test boot <br /> _gip_ -run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min- 5 rain 5 min 5 mug <br /> test: <br /> i <br /> 'fest Start Time: 8:45 <br /> Initial heading(RI), 5 PSI <br /> Test End Time: 9:45 <br /> Final Reading(RF): 5 PSI <br /> Test Duration: 1 Hour 30 min 30 min 30 min <br /> Change in Reading(RF-&): 0 <br /> Pass/Fail Threshold or 0 dr 0 drop 0 drop 0 drop <br /> Criteria: <br /> Test Result: z Pass 0 Fail ❑ Pass ❑Fail 0 Pass ❑Fail ❑ Pass ❑Fail . <br /> Comments— (include information on repairs made prior to testing, and recam ended follow-up for foiled tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.