Laserfiche WebLink
OCT-27-2000 13:219 CIT`( OF LODI 209 333 6717 P.45 <br /> F. lin-Tank. Gaugiina/SIR Equ en t: icck dii�i box if tnnk 1 ing i5 used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipn]ent is installed. <br /> This section ,bust be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com <br /> et ohowin clie Ilst: <br /> cc] e-, ❑ No's Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> Q Yes ❑ NO Were all tank gauging probes visually inspected For damage and residue buildup? <br /> ❑ Yes O No" Was accuracy of system product level readings tested? <br /> C3Yes ❑ No* Was accuracy of system water level readings tested'? <br /> ❑ Yes ❑ No` Were all probes reinstalled properly? <br /> ❑ Yes ❑ No, Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): eek this box if LLDs are not installed. <br /> CAPIete the folio Ing checklist: <br /> Yes C1 Noy For equipment start-up or annual equipment certification, was a leak simulated to verify LLD perfontlance? <br /> 13 NIA (Check all rhos apply) Simulated leak rate: ❑ 3 g.p.h.; O 0.I g.p.h ; ❑ 0,2 g.p.li. <br /> VSyy:S <br /> 0 No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Q No" Was the testing apparatus properly calibrated? <br /> ❑ No" For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A , <br /> ❑ YesA o* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> 21 N/A <br /> O Yes Cl o" For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled .' <br /> N/A or disconnected? <br /> Q Yes 0 No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> N/A malfunctions or fails a test? s <br /> D es No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> NIA <br /> Yes O No* Were all items on the equipment manufacturer's mai <br /> In <br /> completed? 1 <br /> In the Section H,below, describe how and when these deficiencies were or will be corrected. i <br /> E <br /> M Comments: fJ V L � b <br /> Page 3 of 3 03101 <br />