My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
1331
>
2300 - Underground Storage Tank Program
>
PR0231332
>
COMPLIANCE INFO_2011 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2019 3:42:16 PM
Creation date
12/6/2018 9:19:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011 - 2018
RECORD_ID
PR0231332
PE
2361
FACILITY_ID
FA0003961
FACILITY_NAME
LODI MUNI SERVICE CENTER
STREET_NUMBER
1331
Direction
S
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03104050
CURRENT_STATUS
01
SITE_LOCATION
1331 S HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
标签
EHD - Public
Jump to thumbnail
< previous set
next set >
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />7. UNDER -DISPENSER CONTAINMENT (UDC TESTING <br />Page of <br />Test Method Developed By: UDC Manufacturer Industry Standard X Professional Engineer <br />L Other (Spec) <br />Test Method Used: ❑ Pressure 0 Vacuum X Hydrostatic <br />0 Other (Specify) <br />Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: .002 <br />UDC # 4&5 <br />UDC # <br />UDC # <br />UDC # <br />UDC Manufacturer: <br />Western Fiber lass <br />DC Material: <br />Fiber lass <br />DC De the <br />28" <br />ight from UDC Bottom to Top <br />Hi hest Pi in Penetration: <br />r <br />10" <br />ight from UDC Bottom towest Electrical Penetration: <br />Condition of UDC prior to <br />testing: <br />Dry <br />Portion of UDC Tested' <br />Water Level 14" <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />pro and water)?* <br />Yes <br />Turbine shutdown response time <br />Not Alarmed <br />Is system programmed for fail- <br />safe shutdown?* <br />Yes <br />Was fail-safe verified to be <br />operational?* <br />No <br />Wait time between applying <br />water and starting test <br />5 Minutes <br />Test Start Time: <br />3:27 <br />Initial Reading Ri): <br />.001 <br />Test End Time: <br />3:57 <br />Final Reading (RF): <br />.001 <br />Test Duration: <br />30 Minutes <br />Change in Reading RF-Ri : <br />0 <br />Pass/Fail Threshold or Criteria: <br />.005/30 Minutes <br />Test Result: <br />Pass <br />Was sensor removed for testin ?Yes <br />Was sensor properly replaced and <br />verified functional after testing? <br />Yes <br />Comments — (include information on repairs made prior to testing and recommended follow-up forfailed tests) <br />Initial loss due to Seam on Test Boot on Regular 87 Secondary Pipe. <br />Removed Test Boot in UDC. Secured Test Boot on Secondary Pipe in STP Piping Sump, and filled UDC to test level. <br />This method allows Test Fluid to fill UDC and Secondary Pipe simultaneously. <br />Secondary Pipe Test Boot at STP Piping Sump opened at end of testing to allow all Test Fluid to drain. <br />' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.