Laserfiche WebLink
SWRCB, January 2002 <br />7. UNDER -DISPENSER CONTAINMENT (UDC) TESTING <br />Page of <br />Test Method Developed By: ❑ UDC Manufacturer ❑ Industry Standard X Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ❑ Pressure ❑ Vacuum X Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Caldwell Level Change Indicator <br />Equipment Resolution: .002 <br />UDC #al&2 <br />UDC # <br />UDC # <br />UDC # <br />UDC Manufacturer: <br />Western Fiberglass <br />UDC Material: <br />Fiberglass <br />UDC Depth: <br />28" <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />10" <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />6" <br />Condition of UDC prior to <br />testing: <br />Dry <br />Portion of UDC Tested' <br />Water Level 14" <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water)?* <br />Yes <br />Turbine shutdown response time <br />Not Alarmed <br />Is system programmed for fail- <br />safe shutdown?* <br />Yes <br />Was fail-safe verified to be <br />operational?* <br />No <br />Wait time between applying <br />water and starting test <br />5 Minutes <br />Test Start Time: <br />3:27 <br />Initial Reading (RI): <br />.001 <br />Test End Time: <br />3:57 <br />Final Reading (RF): <br />.001 <br />Test Duration: <br />30 Minutes <br />Change in Reading (RF-Ri): <br />0 <br />Pass/Fail Threshold or Criteria: <br />.005/30 Minutes <br />Test Result: <br />Pass <br />Was sensor removed for testing? <br />Yes <br />Was sensor properly replaced and <br />verified functional after testing? <br />Yes <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Initial loss due to Seam on Test Boot on Regular 87 Secondary Pipe. <br />Removed Test Boot in UDC. Secured Test Boot on Secondary Pipe in STP Piping Sump, and filled UDC to test level. <br />This method allows Test Fluid to fill UDC and Secondary Pipe simultaneously. <br />Secondary Pipe Test Boot at STP Piping Sump opened at end of testing to allow all Test Fluid to drain. <br />' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to qny of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />