Laserfiche WebLink
Soil Investigation Work Plan <br /> Heritage Square <br /> Page 5 <br /> TABLE 2 Laboratory Analytical Methods <br /> CONSTITUENT METHOD DETECTION LIMIT <br /> Soil <br /> L BTEX,MTBE 8020 5.0µg/kg <br /> TEPl1-K,D,M0 8015m 1.0 mg/kg(K,D) 10.0 mg/kg(MO) <br /> LGroundwater <br /> BTEX,MTBE 8020 0.5µg/l <br /> TEPH-K,D,MO 8015m 5.0µg/1(K,D)50.0µg/1(MO) <br /> 4.0 HEALTH AND SAFETY PLAN <br /> Prior to commencement of fieldwork, a tailgate safety meeting will be held and a site-specific Health and <br /> Safety Plan will be discussed with, and presented to,all field personnel for their signatures. <br /> 5.0 REPORTING <br /> Condor will prepare a Report of Findings to be submitted to the SJCPHS,EHD. The report will include a <br /> discussion of the field and laboratory procedures'used to conduct the investigation, a discussion and <br /> presentation of the analytical results and subsurface lithology, and recommendations. . A draft of the <br /> report will be presented to the property owner for approval prior to submittal of the final report. <br /> 6.0 PROJECT SCHEDULE <br /> Upon approval of this Work Plan by the SJCPHS,EHD and notification by the property owner to <br /> proceed, the field portion of the investigation can be completed within approximately two to four weeks. <br /> The turn-around time for laboratory analyses is approximately two weeks. A report can be submitted <br /> within two weeks of receipt of the laboratory analyses. If you need additional information or .have any <br /> questions, please call us at(209)234-0518. <br /> Respectfully submitted, <br /> CONDOR EARTH TECHNOLOGIES, INC. <br /> Yertifirc . Crum <br /> ed Engineering Geologist CA#2254 <br /> PA3572D Hentagc Square Gecprebe\Work Plan,doc <br /> i <br /> is CONDOR <br />