My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1025
>
2900 - Site Mitigation Program
>
PR0527594
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2018 9:12:20 AM
Creation date
12/7/2018 9:03:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0527594
PE
2950
FACILITY_ID
FA0018697
FACILITY_NAME
VICTOR ROSASCO
STREET_NUMBER
1025
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15120103
CURRENT_STATUS
01
SITE_LOCATION
1025 E MAIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONDOR EARTH TECHNOLOGIES,INC. GENERAL HEALTH& SAFETY PLAN <br /> FOR WORKING WITH PETROLEUM HYDROCARBONS, <br /> ORGANIC VAPORS AND LIQUID CONTAMINANTS <br /> 1.0 INTRODUCTION <br /> Condor Earth Technologies, hic. has adopted the following Health & Safety Plan for working with <br /> petroleum hydrocarbons, organic vapors, and liquid contaminants that may be encountered during <br /> investigative excavation and sampling operations. Condor technicians will employ photoionization <br /> detector (PID) organic vapor monitoring technology to monitor exposure in order to meet Short Tenn <br /> Exposure Limit (STEL) requirements. The purpose of this plan is to provide health and safety <br /> precautions for the initial and subsequent site visits until the nature and magnitude of the contaminants <br /> have been evaluated. <br /> All work will be done in general accordance with current OSHA regulations and all personnel working <br /> within the exclusion zone at the project site will have completed a 40-hour OSHA training course. A <br /> tailgate safety meeting will be held prior to commencement of work each day and a Health& Safety Plan <br /> will be discussed with and presented to all crewmembers for their signatures. <br /> This Health & Safety Plan is limited to provisions for safe work practices related to exposure to <br /> petroleum products in soil.The suspected contaminants are listed on the contact information page. <br /> 2.0 GENERAL SAFETY MEASURES <br /> Access to the project site shall be limited by the exclusion zone. The exclusion zone shall include an area <br /> at least ten feet from the sampling location and sampling equipment. Non-authorized personnel shall not <br /> be allowed in the exclusion zone.No smoking will be allowed in the exclusion zone. <br /> All Condor personnel, subcontractors, and consultants shall adhere to the provisions of the Condor Site <br /> Safety Plan including all applicable elements of the Condor Illness and Injury Prevention Program(IIPP). <br /> All of the above personnel who participate in fieldwork at the site will attend a safety indoctrination <br /> provided by the Condor Site Safety Officer. The Condor Site Safety Plan is maintained in this work plan. <br /> Copies of this work plan shall be available to all working units of Condor, its subcontractors and <br /> consultants. <br /> 2.1 SITE SAFETY OFFICER RESPONSIBILITIES <br /> The Site Safety Officer shall monitor all activities of equipment and personnel at the project site. Site <br /> Safety Officer responsibilities will include the following: <br /> 1. Limiting access to the exclusion zone to authorized personnel. <br /> 2. Providing written log of on-site activities and events. <br /> 3. Notification of regulatory agencies during emergency procedures. <br /> 4. Enforcement of contaminant exposure site safety precautions. <br /> 5. Document all injuries and safety incidents. <br /> During investigation in soils containing petroleum hydrocarbons, all personnel shall undertake the <br /> following precautions: <br />
The URL can be used to link to this page
Your browser does not support the video tag.