Laserfiche WebLink
MONITORING AND R LOFT" GINC PROGRAM NO. <br /> WESTERN FARM CHEMICAL FACILITY <br /> OPJAE ONUSAN OAGRO G AGRICULTURAL <br /> the ear, an analysis Of their <br /> ol , and plans to improve remediation system <br /> (e) a description of all remedial activities ties c conducted duringY <br /> effectiveness in removing the p <br /> effectiveness; <br /> (f) the anticipated date for completion of cleanup activities; <br /> (g) an identification of any data gaps and potential deficiencies/redundancies in the monitoring <br /> system or reporting program; <br /> (h) if desired, a proposal and rationale for any revisions to the groundwater sampling plan <br /> frequency and/or list of analytes. <br /> The refrequently than required at the locations specified in the <br /> sults of any monitoring done more <br /> d. The Discharger shall implement the above monitoring <br /> MRP also shall be reported to the Boar <br /> program as of the date of the Order. <br /> Ordered by: l 1 <br /> THOMAS R. PINKOS,Executive Officer <br /> (Date) <br /> F <br /> 7 <br />