Laserfiche WebLink
MONITORING AND REpORTING�t• <br /> OGRAM NO.R5-2002- <br /> WESTERN FARM SERVICE <br /> FORMER PUREGRO AGRICULTURAL-CHEMICAL FACILITY <br /> STOCKTON,SAN JOAQUIN COUNTY <br /> (d) a table showing well construction details such as well number, groundwater zone being <br /> monitored, coordinates (northings and castings), ground surface elevation, reference <br /> elevation, elevation of screen, elevation of bentonite, elevation of filter pack, and elevation <br /> of well bottom; <br /> (e) a table showing historical lateral and vertical(if applicable) flow directions and gradients; D <br /> (f) cumulative data tables containing the water quality analytical results and depth to <br /> groundwater; <br /> (g) a copy of the laboratory analytical data report; <br /> (h) if applicable, the status of any ongoing remediation, including cumulative information on <br /> the mass of pollutant removed from the subsurface, system operating time, the effectiveness <br /> of the remediation system, and any field notes pertaining to the operation and maintenance <br /> of the system; and <br /> (i) if applicable, the reasons for and duration of all interruptions in the operation of any <br /> remediation system, and actions planned or taken to correct and prevent interruptions. A <br /> An annual report shall be submitted to the Board by 1 November of each year. This report shall L� <br /> contain an evaluation of the effectiveness and progress of the investigation and remediation, and 11 11 <br /> maybe submitted with the second semi-annual monitoring report. The annual report shall <br /> contain the following minimum information: <br /> (a) both tabular and graphical summaries of all data obtained during the previous year; <br /> (b) groundwater contour maps and pollutant concentration maps containing all data obtained T <br /> during the previous year; 1H <br /> (c) a discussion of the long-term trends in the concentrations of the pollutants in the <br /> groundwater monitoring wells; <br /> (d) an analysis of whether the pollutant plume is being captured by an extraction system or is <br /> continuing to spread; <br /> (e) a description of all remedial activities conducted during the year, an analysis of their T <br /> effectiveness in removing the pollutants, and plans to improve remediation system <br /> effectiveness; <br /> (c) the anticipated date for completion of cleanup activities; <br />