Laserfiche WebLink
containment 1, or the level of Beater basin and may include <br /> maintenance IWired for containment. participating in regional ground water <br /> The degree of removal which may be monitoring, contributing to ground <br /> required will be determined by the water basin cleanup or management <br /> Regional Water Board in the process programs, or contributing to research <br /> of evaluating the proposal for proiects which are publicly accessible <br /> designation of a containment zone. (i.e., not Protected by patents and <br /> The determination of the extent of licenses) and aimed at developing <br /> mass removal required will include remedial technologies that would be <br /> consideration of the incremental cost of used in the ground water basin. <br /> mass removal, the incremental benefit Proposals for off-site cleanup proiects <br /> of mass removal, and the availability may be considered by the Regional <br /> of funds to implement the Provisions Water Board as a mitigation measure <br /> in the management plan for az long as under the following criteria: <br /> water quality objectives-are exceeded I. Off-site cleanup projects must <br /> within the containment zone: be located in the same ground <br /> d. The discharger or a group of water basin as the proposed <br /> dischargers must protose and agree to containment zone, and <br /> imolement a management plan to 2. Implementation of an off-site <br /> assess, cleanup, abate, manage, project must result in o <br /> monitor, and mitigate the remainine improvement in the basin's <br /> an <br /> significant human health, water quality, water quality or protect the <br /> and environmental impacts to the basin's water quality from <br /> satisfaction of the Regional Water pollution. and <br /> Board. Impacts will be evaluated in <br /> accordance with Section 111.14.3. The 3. Off-site Proiecu must include <br /> management plan may include source removal or other <br /> management measures, such as land elements for which water <br /> use controls', engineering controls quality benefits or water <br /> and agreements with other landowners quality Protection can be <br /> or agreements with the landlord or easily demonstrated, and <br /> lessor where the discharger is a tenant qOff-site projects may be <br /> . <br /> or lessee. The contents of the pedischarger or taken from <br /> ependently by the <br /> proposed independently management plan shall be dependent <br /> upon the specific characteristics of the dischrs identified as <br /> Proposed containment zone and must Prooecacceptable by the Regional <br /> include a requirement that the Regional Water Board through a <br /> Water Board be notified of any transfer clearinghouse process, or <br /> of affected property to a new ownerfs) <br /> e. The proposed management plan must 5. In lieu of choosing to finance <br /> Provide reasonable mitigation measures a specific off-site proiect, the <br /> discharger may contribute <br /> significant <br /> substantially lessen avoid any moneys to the SWRCB's <br /> significant adverse environmental Cleanup and Abatement <br /> At amipacts minimum, <br /> theble to the discharge. Account (Account) or other <br /> for <br /> a minimum, the plan must provide funding source. Use of such <br /> for control of pollutantssuch <br /> within the contributions to the Account <br /> containment zone such that water or other source will be limited <br /> quality objectives are not exceeded to cleanup proiects or water <br /> outside the containment zone la a quality Protection projects for <br /> result the discharge. The plan must the basin in which the <br /> also provide, if appropriate, for containment zone is <br /> equivalent entfor in water supplies designated. Contributions are <br /> reimbursement for increased water not to exceed ten percent of <br /> treatment costs to affected users, and the savings in continued active <br /> increased costs associated with well remediation that discharger <br /> modifications. Additional mitigation the specicifiwill accrue over a ten-year <br /> measures may be proposed by the <br /> the period due to designation of a <br /> discharger based c V containment zone (less any <br /> characteristics of the proposed additional costs of <br /> containment zone. Such measures <br /> must assist in water quality containment zone designation <br /> improvement efforts within the ground during this period, e.g., <br /> 8 <br />