Information to Bidders <br /> Soil Excavation, Liner/Cap Construction <br /> Puregro/Brea Facility <br /> Section 1. Page 4 <br /> Bid Item 4. <br /> Bid Item 4. shall consist of paving of the two former evaporation pond areas with asphaltic <br /> concrete, having a minimum thickness of four (4) inches. The asphaltic concrete shall conform <br /> to the requirements of the State of California specification for Type B asphaltic concrete. The <br /> material shall be placed within the appropriate temperature range and shall be properly <br /> compacted in conformance with state and local regulations. Results of the temperature readings <br /> shall be forwarded by mail to Sierra-Pacific upon completion of paving work. The surface of the <br /> installed paving shall slope a minimum of 2 per cent away from the center of each former <br /> evaporation pond area, to provide for positive drainage control. <br /> Bid Item 5. <br /> Bid Item 5. shall consist of survey control of line and grade for excavation and construction of <br /> the liner and cap system, the preparation of an as-built plan and contour map of the completed <br /> paved former pond areas, and the preparation and submittal of a short final report of the work <br /> performed. During excavation and subgrade preparation, the depth of excavation of surface <br /> materials and the direction and gradient of sloping for positive drainage control purposes shall <br /> be verified by survey. A minimum fall of two (2) per cent from the center of each of the two <br /> former evaporation pond areas shall be established on the top of the prepared subgrade, and also <br /> on the top of the installed paving, to provide for positive drainage control. The surveying shall <br /> be performed by a California Licensed Land Surveyor. An as-built plan of both work areas shall <br /> be prepared, which illustrates the as-built surface elevations and drainage directions, including <br /> elevation contours on the finished surface. The as-built plan shall be prepared at a scale of one <br /> inch equals 10 feet. <br /> The Contractor shall prepare and submit at the completion of this work a short report of the work <br /> activities performed, including, but not limited to, such items as the date work commenced, the <br /> date excavation and soil staging work was completed, the date the geosynthetic liner was <br /> completed, the date the paving was completed, the results of the subgrade, aggregate baserock, <br /> and asphaltic concrete tests, and the date of work completion. Daily work reports may be <br /> included as an appendix to this summary report. <br />