My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BROADWAY
>
1905
>
2900 - Site Mitigation Program
>
PR0518600
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2018 10:53:10 AM
Creation date
12/7/2018 10:30:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0518600
PE
2960
FACILITY_ID
FA0013996
FACILITY_NAME
CROP PRODUCTION SERVICES
STREET_NUMBER
1905
Direction
N
STREET_NAME
BROADWAY
City
STOCKTON
Zip
95205
APN
14315004
CURRENT_STATUS
01
SITE_LOCATION
1905 N BROADWAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
626
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Information to Bidders <br /> Soil Excavation,Liner/Cap Construction <br /> PuregroBrea Facility <br /> Section 2. Page 3 <br /> IMM UNIT <br /> NO. DESCRIPTION 4UUNIT PRICE AMOUNT <br /> S. Composite Liner <br /> Placement, BacIc Eilling, <br /> and Compaction N/A Cu. Yd. $ N/A <br /> 9. Compaction Testing N/A Each $ N/A <br /> 10. Paving N/A Sq. Ft. $ N/A <br /> 11. Level"C" PPE 1 Person I Day $ N/A <br /> 12. Additional Survey Control N/A 1 Day $ N/A <br /> NOTES: <br /> 1. The bidder is referred to the attached site plan and detail sheet, and to Section 1., above. <br /> 2. Optional Item 11., above, shall include the cost for Occupational Health and Safety <br /> Administration (OSHA) Level C personal protective equipment (PPE), as specified by the <br /> EPA Office of Emergency and Remedial Response. The PPE shall be maintained and <br /> inspected as specified in the federal Code of Regulations under 29 CFR 1910.132. <br /> 3. As noted in Section 1 above, the bidder shall submit a list of all equipment to be used on the <br /> project along with the hourly rates to be charged for such use. <br /> Company Officer's Authorized Signature Date <br /> Name (Please Print) Title <br /> Company Name <br />
The URL can be used to link to this page
Your browser does not support the video tag.