Laserfiche WebLink
WORKPLAN: BROADWAY STREET <br /> wells) will be sampled three times: in September, December, and March. Unless told <br /> otherwise, I will assume that the timeline is correct. <br /> Section 3.8 lists the analytical methods to be employed during each sampling event. In order <br /> to maintain continuity with the earlier quarters of sampling, the EPA 624 scan is not to be <br /> used; the EPA 601 scan is to be used instead. The other analysis methods are satisfactory. I <br /> assume that pH and EC measurements will be taken in the field. As usual, all holding times <br /> must be met. <br /> Section 3.9 states that quarterly monitoring reports will be submitted. I would appreciate it <br /> if each report contained a summary table showing the groundwater monitoring results from <br /> May 1993 through the quarter being reported. <br /> If you have any questions, or need any help in locating files within the office, I can be <br /> reached at (916) 255-3104. <br /> cL P�J-) <br /> WENDY WYELS <br /> Ag Regulatory Unit <br /> cc: Mr. Michael Infurna, San Joaquin County Environmental Health, Stockton <br /> Mr. John Rapp, Sierra Pacific Consultants, El Dorado Hills <br />