My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BROADWAY
>
1905
>
2900 - Site Mitigation Program
>
PR0518600
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2018 10:53:10 AM
Creation date
12/7/2018 10:30:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0518600
PE
2960
FACILITY_ID
FA0013996
FACILITY_NAME
CROP PRODUCTION SERVICES
STREET_NUMBER
1905
Direction
N
STREET_NAME
BROADWAY
City
STOCKTON
Zip
95205
APN
14315004
CURRENT_STATUS
01
SITE_LOCATION
1905 N BROADWAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
626
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T APR 3 0 1993 � <br /> t O <br /> j;jRN :rNt�CENTAL i IEALTH �J <br /> CONDOR EARTH TECHNOLOGIESyllb � <br /> 1125 No. Golden State Blvd. 21663 Brian Lane <br /> Suite H P.O. Box 3905 <br /> P.O. Box 3448 Sonora, CA 95370 <br /> Turlock, CA 95381 (209)532-0361 <br /> (209)668-9234 FAX(209)532-0773 <br /> April 28, 1993 FAX(209)668-9248 <br /> Wendy Wyels <br /> Ag Regulatory Unit <br /> CRWQCB-Central Valley Region <br /> 3443 Routier Road, Suite A <br /> Sacramento, CA 95827-3098 <br /> RE: PureGro/Brea Soil and Groundwater Investigation <br /> 1905 N. Broadway, Stockton, San Joaquin County, CA <br /> Dear Ms. Wyels: <br /> Thank you for your letter of 26 April 1993 regarding the amendment to the Soil <br /> and Groundwater Investigation Work Plan for the PureGro/Brea facility in <br /> Stockton. Please make the following change to my letter of 19 April 1993. <br /> The first full paragraph (first bullet item) on page 3 should be replaced with <br /> the following: <br /> • AGREEMENT: Initial groundwater samples will be analyzed for 1,2- <br /> dichloropropane (1,2-DCP) by EPA Method 601, for nitrate+nitrite <br /> by EPA Method 300, for total Kjeldahl nitrogen (TKN) by EPA Method <br /> 351.3, for total petroleum hydrocarbons quantified as diesel (TPH- <br /> D) and for total petroleum hydrocarbons quantified as gasoline <br /> (TPH-G) by EPA Methods 3510 and 5030, respectively. <br /> The information regarding nitrate+nitrite and TKN was inadvertently omitted <br /> from the 19 April letter. I apologize for any confusion the omission may have <br /> caused. Thank you for bringing it to my attention. <br /> Work is scheduled to commence at the PureGro Brea site at 7:00 a.m. on <br /> Tuesday, May 4, 1993. <br /> Resp&I <br /> fully submitte , <br /> Gail L. Holmes <br /> Project Geologist <br /> cc: Nick Nickerson, UNOCAL <br /> Paul Cort, E&E <br /> James James, E&E <br /> Jan Wagner, UNOCAL/PureGro <br /> Bob Mercer, CPS <br /> Donald Bishop, CONDOR <br /> Michael infurna, San Joaquin County EHD <br /> PGR0:Dnoc1WP2.Adm <br /> ENVIRONMENTAL GEOLOGICAL ENGINEERING GEOTECHNICAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.