My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BROADWAY
>
1905
>
2900 - Site Mitigation Program
>
PR0518600
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2018 10:53:10 AM
Creation date
12/7/2018 10:30:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0518600
PE
2960
FACILITY_ID
FA0013996
FACILITY_NAME
CROP PRODUCTION SERVICES
STREET_NUMBER
1905
Direction
N
STREET_NAME
BROADWAY
City
STOCKTON
Zip
95205
APN
14315004
CURRENT_STATUS
01
SITE_LOCATION
1905 N BROADWAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
626
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E APR 23 1993 <br /> T ENVIRONMENTAL HEALTH <br /> CONDOR EARTH TECHNOLOGIES INC. PERMIT/SERVICES <br /> 1125 No. Golden State Blvd. 21663 Brian Lane <br /> Suite H P.O. Box 3905 <br /> P.O. Box 3448 Sonora, CA 95370 <br /> Turlock, CA 95381 FAX )532 532-0773 <br /> 361 <br /> (209)668-9234 <br /> FAX(209)668-9248 <br /> April 22, 1993 <br /> MEMORANDUM <br /> Mike Infirm <br /> TO: Wendy Wyels , CVRWQCB <br /> Paul Cort and James M. James, E&E <br /> Nick Nickerson, UNOCAL <br /> Jan Wagner, UNOCAL/PureGro <br /> Bob Mercer, Crop Production Service <br /> Donald T. Bishop, CONDOR <br /> FROM: Gail L. Holmes, CONDOR <br /> RE: Soil and Groundwater Investigation <br /> PureGro/Brea Facility, 1905 No. Broadway, Stockton, <br /> California <br /> The installation of 4 monitor wells at the PureGro/Brea <br /> Stockton Facility has been scheduled for May 4, 5, 6 and 7, 1993. <br /> The dates were inadvertently omitted from the Addendum to the <br /> Work Plan dated April 19, 1993 . <br /> Pcro\AddenWP.MMo <br /> ENVIRONMENTAL GEOLOGICAL ENGINEERING GEOTECHNICAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.