Laserfiche WebLink
Page 2 of2 <br /> welded in place with an adhesive for additional assurance of a complete repair. Following the installation of <br /> the patch, the excavated areas will be back filled then paved with asphalt by a licensed paving contractor. <br /> By conducting the borings and temporarily filling the holes in advance of saw cutting the larger area necessary <br /> for installing the patch, we will limit the potential of damaging the exposed liner during drilling activities. <br /> Please let me know if you have any questions regarding this procedure and if we are authorized to advance <br /> vertical borings to collect soil samples beneath the capped areas. <br /> Thanks, <br /> Todd Leonard, CEM <br /> Managing Principal <br /> ENVIRONMENTAL.INC. <br /> 527 Lander St. Suite 204 <br /> Reno, Nevada 89509 <br /> (775) 622-0857 Office <br /> (775) 720-3930 Cell <br /> tleonord@rubikenvironmental.com <br /> http://rubikenvironmenta1.com <br /> 3/14/2011 <br />