My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BROADWAY
>
1905
>
2900 - Site Mitigation Program
>
PR0518600
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2018 10:39:46 AM
Creation date
12/7/2018 10:37:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0518600
PE
2960
FACILITY_ID
FA0013996
FACILITY_NAME
CROP PRODUCTION SERVICES
STREET_NUMBER
1905
Direction
N
STREET_NAME
BROADWAY
City
STOCKTON
Zip
95205
APN
14315004
CURRENT_STATUS
01
SITE_LOCATION
1905 N BROADWAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOIL INVESTIGATION WORK PLAN <br /> Crop Production Services Branch No. 0514 <br /> 1905 N. Broadway Avenue <br /> Stockton, California <br /> Drilling operations summary: <br /> 02,05 4 • 16 CPT borings to a maximum of 150'for the purpose of defining subsurface geology& <br /> hydrogeology.Work to be performed by Gregg Drilling. <br /> CPT borings to be grouted upon completion of each hole. <br /> 1 8"hollow-stem auger boring advanced to a maximum of 50'with a limited access, <br /> track mounted rig which will be craned into place within an existing tank farm in the <br /> vicinity of L4(see attached map). Purpose is to obtain soil samples to be analyzed for <br /> C )y fumigants(EDB, DBCP), nitrate as nitrogen, and ammonia, VOCs, and low-level 1,2,3- <br /> pwre_� TCP and log subsurface soil types. <br /> 38 8" hollow-stem auger borings advanced to a maximum of 50'. Purpose is to obtain <br /> soil samples to be analyzed for fumigants(EDB, DBCP), nitrate as nitrogen, and <br /> ammonia,VOCs, and low-level 1,2,3-TCP and log subsurface soil types. <br /> `. All hollow-stem auger borings to be tremmie-grouted to surface with cement slurry by <br /> \\ end of drilling day. <br /> Proposed drilling schedule: <br /> • CPT boring from March 8"to March 14'" <br /> • Limited access rig on March 15" <br /> 38 auger borings from March 16`"to approximately March 301" <br /> Proposed boring locations depicted on attached Figure. <br />
The URL can be used to link to this page
Your browser does not support the video tag.