My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BROADWAY
>
1905
>
2900 - Site Mitigation Program
>
PR0518600
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2018 10:39:46 AM
Creation date
12/7/2018 10:37:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0518600
PE
2960
FACILITY_ID
FA0013996
FACILITY_NAME
CROP PRODUCTION SERVICES
STREET_NUMBER
1905
Direction
N
STREET_NAME
BROADWAY
City
STOCKTON
Zip
95205
APN
14315004
CURRENT_STATUS
01
SITE_LOCATION
1905 N BROADWAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Aquifer Testing Work Plan • • <br /> Former PureGro <br /> Bro Facility <br /> ' <br /> Stockton, <br /> ton, Broadway Avenue - <br /> S[ock[on,California <br /> Sierra-Pacific Project No. 94-055.05 <br /> ' 4.9 Installation of the Pumping Well <br /> After Sierra-Pacific has installed both new observation wells, has developed and pump-tested the <br /> ' observation wells, and has collected and tested ground water samples, the drilling contractor will be <br /> ' mobilized for the third time and a 6-inch-diameter extraction well will be constructed at location E-1 <br /> on Figure 7 in accordance with the design of the observation wells. The extraction well will be used to <br /> ' perform a series of aquifer tests,as described below. Only contaminated intervals will be screened and <br /> tested. <br /> Screened intervals of the pumping well will likely be similar in length and position to the screened <br /> intervals of the observation wells. The well boring will be 12 inches in diameter. The slot-sizes and <br /> filter sand used to construct the extraction well will be larger than used for observation wells. The <br /> ' pumping well will be constructed to optimize the flow-rate and well efficiency. Individual aquifers will <br /> be isolated during the aquifer tests with expandable packers to selectively pump from the desired aquifer. <br /> t If the multiple aquifers identified in the observation well behave as a single unconfined aquifer,it may <br /> be necessary to screen the entire saturated interval between the aquifers. <br /> 4.10 Aquifer Tests <br /> ' A series of 8-hour aquifer (pumping) tests will be conducted at the Giglio property to determine the <br /> transmissivity and storage coefficient of the contaminated aquifers. Multiple confined or leaky aquifers <br /> ' will require multiple aquifer tests. Each aquifer test will involve a period of sustained pumping and <br /> concurrent water level measurements. The aquifers will be tested by pumping,then again by monitoring <br /> ' the recharge period. If ground water elevations do not stabilize within 8-hours,pumping will continue <br /> for 24 hours if necessary. <br /> ' An automated GL-300A data logger,manufactured by Global Water of Gold River, California will be <br /> ' employed for recording the draw-down of ground water in the extraction well (E-1), two observation <br /> wells (0-1 and 0-2),and monitoring well MW-8. Pressure transducers will be placed in the extraction <br /> ' well and in each of the observation wells. According to the manufacturer,the pressure transducers have <br /> an accuracy rating equivalent to t 0.002 feet of hydraulic head. Data will be recorded at a fixed rate <br /> ' SIERRA-PACIFIC GROUP 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.