My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOWER SACRAMENTO
>
1613
>
1600 - Food Program
>
PR0541351
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2022 2:09:13 PM
Creation date
12/7/2018 7:23:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0541351
PE
1625
FACILITY_ID
FA0023696
FACILITY_NAME
MCDONALDS 36681
STREET_NUMBER
1613
Direction
S
STREET_NAME
LOWER SACRAMENTO
STREET_TYPE
RD
City
LODI
Zip
95242
APN
04931058
CURRENT_STATUS
01
SITE_LOCATION
1613 S LOWER SACRAMENTO RD
P_LOCATION
02
QC Status
Approved
Scanner
SJGOV\jcastaneda
Supplemental fields
FilePath
\MIGRATIONS\L\LOWER SACRAMENTO\1613\PR0541351\PLANS.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL PLUMBING NOTES ABBREVIATIONS w m <br /> GENERAL: BELOW 45 PSI STATIC, A PRESSURE BOOSTER SYSTEM SHALL BE INSTALLED. ACM AREA CONSTRUCTION MANAGER <br /> 1 . ALL WORK PERFORMED SHALL BE IN ACCORDANCE WITH ALL LOCAL CODES <br /> AND ACCEPTABLE TO THE AUTHORITY HAVING JURISDICTION. 4. IF THE RESTAURANT HAS A COMBINED WATER AND FIRE SPRINKLER SERVICE, <br /> THE INCOMING WATER SERVICE SHALL BE SIZED BASED ON THE FIRE <br /> 2. ALL PLUMBING WORK SHALL BE PERFORMED BY A LICENSED PLUMBER. SPRINKLER CONTRACTOR'S HYDRAULIC CALCULATIONS. AVB ATMOSPHERIC VACUUM BREAKER <br /> 3. ALL DIMENSIONS, CLEARANCES AND TOLERANCES SHALL BE VERIFIED PRIOR 5. PROVIDE A MINIMUM Y2" ANNULAR CLEARANCE AROUND ALL PIPE SLAB <br /> TO INSTALLATION. ALL ROUGH-IN LOCATIONS SHALL BE COORDINATED WITH PENETRATIONS. BSI BEVERAGE SYSTEM INSTALLER <br /> THE MANUFACTURER'S SUBMITTAL INFORMATION. <br /> 6. A REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTER (RPZ) SHALL BE <br /> 4. ALL DIMENSIONAL INFORMATION IS AS FOLLOWS (UNLESS NOTED OTHERWISE): INSTALLED AT THE INCOMING SERVICE WHERE REQUIRED BY CODE. CO CLEAN-OUT <br /> A. UNDERGROUND PIPE IS TO FOUNDATION z <br /> 0 <br /> B. OVERHEAD PIPE IS TO FINISHED WALL 7. AN EXPANSION TANK SHALL BE INSTALLED ON THE COLD WATER LINE INLET <br /> C. ELEVATIONS ARE TO FINISHED FLOOR TO THE WATER HEATER. SEE EXPANSION TANK SCHEDULE. DC DOWNSPOUT COVER w <br /> v <br /> 5. ALL MATERIALS, FIXTURES AND EQUIPMENT USED SHALL BE IN ACCORDANCE 8. ALL WATER SUPPLY PIPE WITHIN 5 FT. OF THE BUILDING AND INSIDE THE <br /> w <br /> WITH McDONALD'S SPECIFICATIONS. SPECIFICATIONS ARE CONTAINED WITHIN BUILDING SHALL COMPLY WITH NSF 61 AND SHALL BE TYPE L COPPER DFU DRAINAGE FIXTURE UNIT(S) <br /> THESE DRAWINGS AND THE McDONALD'S PROJECT MANUAL, ANY CONTRACTOR TUBING, COPPER PIPE OR CPVC PIPE. <br /> IN NEED OF A COPY OF THE McDONALD'S PROJECT MANUAL SHALL CONTACT <br /> THE McDONALD'S AREA CONSTRUCTION MANAGER. ANY VARIANCE FROM THE 9. CPVC PIPE SHALL BE FLOWGUARD GOLD OR FLOWGUARD BENDABLE AS EC ELECTRICAL CONTRACTOR <br /> McDONALD'S SPECIFICATIONS SHALL BE REVIEWED AND APPROVED BY THE MANUFACTURED BY LUBRIZOL. z <br /> ENGINEEROFRECORD. 10, CPVC PIPE SHALL BE CONNECTED WITH FLOWGUARD GOLD YELLOW LOW-VOC <br /> SOLVENT CEMENT AS MANUFACTURED BY IPS WELD-ON OR OATEY. FAC FIRE ALARM CONTRACTOR w <br /> 6. SEE COORDINATION SCHEDULE FOR ADDITIONAL SCOPE OF WORK. Of <br /> 7. ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH ITS LISTING 11 . ALL CPVC PIPE SHALL BE INSULATED TO PREVENT EXPOSURE TO GREASE. z <br /> FCO FLOOR CLEAN-OUT <br /> AND/OR THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. 12. ALL SUSPENDED PIPE SHALL BE SUPPORTED AS FOLLOWS: 0 <br /> 8. WHERE POOR SOIL CONDITIONS EXIST OR WHERE SUBSTANTIAL SETTLEMENT MATERIAL MAX. HORIZ. SPACING MAX. VERT, SPACING FD FLOOR DRAIN N <br /> OF EITHER THE PIPING, THE BUILDING OR ADJACENT WALKS, PLANTERS, ETC., COPPER PIPE 12 FT. 10 FT. w <br /> MAY OCCUR, THE CONTRACTOR SHALL PROVIDE ADEQUATE UNDERSLAB COPPER TUBING <1Y4" 6 FT. 10 FT. N Q <br /> STAINLESS STEEL PIPE HANGERS OR APPROVED OTHER SUPPORT. COPPER TUBING >11'2" 10 FT. 10 FT. FPC FIRE PROTECTION CONTRACTOR \ o <br /> 9. ALL PIPE SLEEVES SHALL BE PROPERLY SEALED AND INSULATED TO PREVENT CPVC <1 " 1 3 FT. 10 FT, <br /> HEAT LOSS AND SEEPAGE. CPVC >1Y4" 4 FT. 10 FT. m w <br /> FS FLOOR SINK w <br /> 10. ALL PIPE INSULATION SHALL BE PROTECTED FROM DAMAGE FROM PIPE 13, A REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTER (RPZ) SHALL BE <br /> HANGERS, PROTECTION SHALL BE LIGHT GAUGE GALVANIZED STEEL OR INSTALLED AT THE INLET TO THE WATER FILTRATION SYSTEM. ALL PIPING <br /> DOWNSTREAM OF THE RPZ SHALL BE COPPER OR CROSS-LINKED QRo�Ess�aygt <br /> EQUAL. POLYETHYLENE (PEX). GC GENERAL CONTRACTOR <br /> 11 . ALL PENETRATIONS OF FIRE RATED WALLS SHALL BE FIRESTOPPED WITH AN 14. ALL DEVICES, APPLIANCES, AND APPARATUS INTENDED TO SERVE SOME Lv 34 gwo <br /> APPROVED AND LISTED FIRESTOPPING SYSTEM. GI GREASE INTERCEPTOR <br /> SPECIAL FUNCTION SHALL BE PROVIDED WITH PROTECTION AGAINST BACKFLOW <br /> SANITARY AND VENT SYSTEMS: AND CONTAMINATION OF THE WATER SUPPLY SYSTEM. ALL BACKFLOW ��L \* <br /> 1 . THE BUILDING SANITARY PIPE SHALL BE LOCATED A MINIMUM OF 5 FT. FROM PREVENTION DEVICES SHALL BE ASSE LISTED AND APPROVED FOR THE DEVICE �r� HAM <br /> OR APPLIANCE THEY SERVE. GPF GALLONS PER FLUSH OF CALOF N <br /> THE INCOMING WATER SERVICE. WHERE A 5 FT. SEPARATION IS NOT �6 <br /> POSSIBLE, THE BOTTOM OF THE WATER SERVICE PIPE SHALL BE A MINIMUM �`L <br /> OF 12 IN. ABOVE THE TOP OF THE HIGHEST POINT OF THE SANITARY PIPE. 15. ALL WATER SUPPLY ONES SHALL BE PROVIDED WITH A QUARTER-TURN ��� <br /> SHUT-OFF VALVE BEFORE FINAL CONNECTION TO EQUIPMENT. GPM GALLONS PER MINUTE <br /> 2. ALL SANITARY AND VENT PIPE SHALL BE PVC TYPE DWV, ABS OR CAST-IRONC <br /> WHERE REQUIRED BY CODE. <br /> 16. QUARTER-TURN SHUT-OFF VALVES SHALL BE INSTALLED UPSTREAM OF ANY WON <br /> m z <br /> INLINE BACKFLOW PREVENTION DEVICE. GW GREASE WASTE F <br /> 3. ALL HORIZONTAL SANITARY PIPE SHALL BE INSTALLED WITH A MINIMUM PITCH , oC w <br /> AS FOLLOWS: <br /> 17. ALL VALVES AND BACKFLOW PREVENTION DEVICES SHALL BE INSTALLED WITH o <br /> FITTINGS THAT FACILITATE REMOVAL IN CASE OF FAILURE. ITS HAND SINK oc <br /> PIPE SIZE MIN. SLOPE <br /> 21/2" OR LESS Y4" PER FT. 18, ALL OVERHEAD WATER LINES SHALL BE INSULATED WITH 1 " THICK EXTERNAL losom <br /> 3" TO 6" Y8" PER FT, JACKETED INSULATION AND A MINIMUM INSTALLED R-VALUE OF 3.7. I.P.S. IRON PIPE SIZE (ALSO NPS) y <br /> 8" OR LARGER %6" PER FT. <br /> 19. PRIOR TO BUILDING TURNOVER, THE DOMESTIC WATER SUPPLY SYSTEM SHALL �. <br /> 4. CLEANOUTS SHALL BE INSTALLED IN ALL HORIZONTAL DRAINAGE PIPE AND BE PURGED OF DELETERIOUS MATERIAL AND DISINFECTED. DISINFECTION KEI KITCHEN EQUIPMENT INSTALLER W <br /> SHALL BE LOCATED NOT MORE THAN 100 FT. APART. SHALL BE DONE IN ACCORDANCE WITH THE LOCAL HEALTH CODE, PLUMBING E <br /> CODE OR IN ACCORDANCE WITH AWWA C651 OR AWWA C652. m <br /> 5. CLEANOUTS SHALL BE INSTALLED AT ALL CHANGES OF DIRECTION GREATER ' <br /> THAN 45 DEGREES. WHERE MORE THAN ONE CHANGE OF DIRECTION OCCURS KES KITCHEN EQUIPMENT SUPPLIER < O <W <br /> Q � ago <br /> IN A SINGLE PIPE RUN, ONLY ONE (1 ) CLEANOUT SHALL BE REQUIRED FOR `m U <br /> EVERY 40 FEET OF DEVELOPED LENGTH. <br /> �5 <br /> LAV LAVATORY <br /> 6. CLEANOUTS SHALL BE INSTALLED ON PIPES PRIOR TO ANY SLAB o <br /> PENETRATION. >' °° T ° <br /> MC MECHANICAL CONTRACTOR 0 U 6 0 °�La o o.o <br /> 7. WHERE PIPING IS LOCATED WITHIN WALL CAVITIES, ACCESS TO THE CLEANOUTS <br /> SHALL BE PROVIDED. c J 0 ° ° ° 6 <br /> L O- 0 <br /> MHT MALE HOSE THREADS J ° o T-°o ao <br /> 8. CLEARANCE ON NOT <br /> AND SMALLER PIPES SHALL BE PROVIDED WITH A BACKFLOW PREVENTER SCHEDULE 0 °� <br /> � 3 � _ <br /> CLEARANCE OF NOT LESS THAN 18 IN. CLEANOUTS ON 8-IN. AND LARGER o �+ ° .Q u) � 0- <br /> PIPE SHALL BE PROVIDED WITH A CLEARANCE OF NOT LESS THAN 36 IN. MS MOP SINK Q Q - ° Q) U <br /> 9. ALL SUSPENDED SANITARY AND VENT PIPE SHALL BE SUPPORTED AS ASSE ° -°o_ o.� ° <br /> FOLLOWS: p 3 <br /> TYPE MFR. MODEL LISTING SERVES LOCATION o 0 L <br /> MAX. HORIZ. MAX. VERT. DCV WATTS SD-3 1022 SODA TOWERS AND SPEC. COFFEE NPS NATIONAL PIPE THREAD STANDARD O 0 - _ a <br /> O U 0 0 ° O <br /> MATERIAL SPACING SPACING <br /> pc U p Q 6 <br /> -p O cn E <br /> ABS 4 FT, 10 FT. NET NATIONAL PIPE THREAD TAPERED ° ° o 0 ° <br /> PVC (TYPE DWV) 4 FT. 10 FT. COORDINATION SCHEDULE - 0 u� ° Q) 0 <br /> CAST-IRON (<10 FT. PIPE SECTIONS) 5 FT. 15 FT. o J~.�� o <br /> 0/0 OWNER/OPERATOR a ° L <br /> CAST-IRON (10 FT. PIPE SECTIONS) 10 FT. 15 FT. FINAL NOTES: w o ° 0 o <br /> 10. ALL PLUMBING FIXTURES SHALL BE VENTED AND THE MAXIMUM DISTANCE 1 . THIS SCHEDULE IS INTENDED AS A GUIDE FOR THE WORK TO BE O <br /> GENERAL REQUIREMENTS FURNISH INSTALL CONNECTION NOTES PERFORMED. ALL WORK SHALL BE COORDINATED BETWEEN THE <br /> FROM THE FIXTURE TRAP TO THE VENT SHALL BE AS FOLLOWS: OH OVERHEAD Q 7F ° L 0 <br /> MECHANICAL PERMIT MC 1 -3 McDONALD'S AREA CONSTRUCTION MANAGER AND ALL GC AND Q� L <br /> TRAP SIZE SLOPE DISTANCE p ° ° U <br /> 0 0 SUBCONTRACTORS. 0 L o 0 <br /> HOT WORK (WELDING) PERMIT (IF APPLICABLE) KES 1 -3 / <br /> 1Y4" Y4" PER FT. 2'-6" 0 c-E ,2 0,Q- <br /> PLUMBING PERMIT PC 1 -3 P PUMP o °.� 0 <br /> 1/2' /4" PER FT. 3' 6" 2. ONE (1) COPY OF THE DECOR PACKAGE DRAWINGS SHALL BE - <br /> ELECTRICAL PERMIT EC 1 -3 SUPPLIED TO THE GENERAL CONTRACTOR AND EACH OF THE 19 0 p 3 p 0 0 6 <br /> 2" /4" PER FT. 5'-0" o :!E� _0 > ° -0 co C <br /> FIRE SPRINKLER PERMIT (IF APPLICABLE) FPC 1 -3 SUBCONTRACTORS. IT SHALL BE THE RESPONSIBILITY OF THE c 0 � V 0 °U' ° <br /> 3" Y8" PER FT. 6'-0" PC PLUMBING CONTRACTOR Q co Q° ( > <br /> „ FIRE ALARM PERMIT (IF APPLICABLE) FAC 1 -3 GENERAL CONTRACTOR AND THE SUBCONTRACTORS TO INSURE � 0- o o ) L L <br /> 4" & LARGER /8 PER FT. 10'-0" <br /> CONTRACTOR COORDINATION REQUIREMENTS THAT THEY HAVE RECEIVED THE DECOR PACKAGE DRAWINGS. ° 3 0 <br /> 11 . ALL PLUMBING VENTS THROUGH THE ROOF SHALL TERMINATE A MINIMUM OF PLUMBING SYSTEMS RC REFRIGERATION CONTRACTOR <br /> 3. FOR ANY WORK NOT CLARIFIED IN THIS SCHEDULE OR IN THE w <br /> 18 INCHES ABOVE THE ROOF AND SHALL BE LOCATED A MINIMUM OF 8 FT. ' r o 0 <br /> WATER HEATERS MCD CP PC PC 1 -4 NOTES AND SPECIFICATIONS, PLEASE CONSULT THE McDONALD'S } Q 6 m w w ° u N <br /> FROM ANY PARAPET WALL. WHERE A VENT TERMINATES WITHIN 8 FT. OFA o � w Q0 <br /> PARAPET WALL, THE VENT SHALL TERMINATE A MINIMUM OF 6 INCHES ABOVE HOT AND COLD WATER PIPE PC PC PC 1 -4 AREA CONSTRUCTION MANAGER FOR SCOPE OF WORK. m w o c U' o <br /> REDUCED PRESSURE PRINCIPLE z Ld N ``: - E � N <br /> THE PARAPET. VENTS AND INTAKES PC PC PC 1 -4 RPZ BACKFLOW PREVENTER Q w � w w w o <br /> 4. SEE PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION. - Q > <br /> LEGEND THERMOSTATIC MIXING VALVE PC PC PC 1 -4 o o 0 0 <br /> 12. ALL PLUMBING VENTS SHALL TERMINATE A MINIMUM OF 10 FT. HORIZONTALLY POWER AND CONTROL WIRING EC EC EC 1 -5 <br /> FROM ANY OUTDOOR AIR INTAKE. WHERE A PLUMBING VENT IS LOCATED 5. SEE ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION. SS SANITARY SEWER <br /> WITHIN 10 FT. OF AN INTAKE, THE VENT SHALL TERMINATE A MINIMUM OF 2 <br /> FT. ABOVE THE INTAKE. COLD WATER PIPING N <br /> ST STORM SEWER <br /> 13. ALL SIDE WALL VENT TERMINATIONS SHALL BE PROTECTED TO PREVENT BIRDS <br /> OR RODENTS FROM ENTERING OR BLOCKING THE VENT OPENING. - - - - TEMPERED WATER PIPING (1 107) 1 0 <br /> PLUMBING FIXTURE SCHEDULE SVB ANTISIPHON, SPILL RESISTANT o <br /> 14. ALL FLOOR DRAINS THAT DO NOT SERVE EQUIPMENT SHALL BE PROTECTED VACUUM BREAKER <br /> AGAINST DRYING OUT EITHER THROUGH THE INSTALLATION OF A TRAP PRIMER, HOT WATER PIPING (1407) TAG DESCRIPTION MANUFACTURER MODEL WATER USE ACCESSORIES/COMMENTS <br /> DEEP SEAL TRAP OR PROSET TRAP GUARD. FCO 6x6 FLOOR CLEAN OUT TAB TEST AND BALANACE CONTRACTOR <br /> ZURN Z1400-SZ SEE DRAWINGS FOR PIPE SIZES Q <br /> JAY R. SMITH 4040 SEE NOTE 8 <br /> 15. ALL APPLIANCES SHALL DRAIN TO AN APPROVED SANITARY WASTE RECEPTOR UNDERGROUND WASTE PIPING U <br /> (FLOOR SINK OR FLOOR DRAIN WITH FUNNEL). INDIRECT DRAINAGE FROM AN FS-2 8x8 FLOOR SINK WITH HALF-GRATE ZURN ZN1910 PIPE SIZE: 3" <br /> APPLIANCE SHALL MAINTAIN AN AIR GAP BETWEEN THE PIPE OUTLET AND THE JAY R. SMITH 3415 DOME STRAINER: ALUMINUM UG UNDERGROUND Q J Q o <br /> LLJ <br /> TOP OF THE RECEPTOR, THE MINIMUM DISTANCE BETWEEN THE PIPE OUTLET _ _ _ _ _ _ _ w <br /> VENT PIPING o z <br /> O :2Q <br /> AND THE TOP OF THE RECEPTOR SHALL BE TWICE THE DIAMETER OF THEZ o w � <br /> APPLIANCE DRAIN PIPE. NOTES: UR URINAL - :E <br /> 1 . SEE McDONALD'S PROJECT MANUAL FOR ADDITIONAL MANUFACTURERS TO ORDER PLUMBING FIXTURES, Q 0 � C <br /> DOMESTIC SUPPLY SYSTEMS: EXISTING UNDERGROUND WASTE PIPING 2. PLUMBING CONTRACTOR SHALL COORDINATE WITH G.C. TO PROVIDE BLOCKING FOR PROPER URINAL SUPPORT CONTACT HUGHES SUPPLY: O oLj_ Li <br /> L'i � <br /> 1 . THE INCOMING WATER SERVICE PIPE SHALL BE LOCATED A MINIMUM OF 5 FT. 3. PLUMBING CONTRACTOR SHALL COORDINATE WITH G.C. TO PROVIDE INTERIOR BLOCKING ON W/W BUILDING FOR WALL CLAMP E-MAIL: V VENT � Q o <br /> FROM THE EXITING SANITARY PIPE, WHERE A 5 FT. SEPARATION IS NOT 4. YARD HYDRANT IS FOR TRASH CORRAL - SEE SITE PLAN FOR LOCATION MCDCOORD@HUGHESSUPPLY.COM m z w <br /> POSSIBLE, THE BOTTOM OF THE WATER SERVICE PIPE SHALL BE A MINIMUM THERMOSTATIC MIXING VALVE 5. PLUMBING CONTRACTOR SHALL ROUTE Y8" DRAIN PIPE FROM HOSE BIBB TO NEAREST FLOOR DRAIN OR FLOOR SINK OR MCDCOORD@HAJOCA.COM O O` - o o <br /> OF 12 IN. ABOVE THE TOP OF THE HIGHEST POINT OF THE SANITARY PIPE. 6. PLUMBING CONTRACTOR SHALL COORDINATE WITH G.C. TO PROVIDE BLOCKING FOR PROPER SINK SUPPORTJ w <br /> WC WATER CLOSET <br /> g <br /> 7. SEE KITCHEN DRAWINGS FOR ADDITIONAL INFORMATION - PLUMBING CONTRACTOR SHALL COORDINATE INSTALLATION WITH K.E.S. O w w o <br /> 2. ALL UNDERGROUND SITE PLUMBING SHALL CONFORM TO NSF 61 , SHALL BE ® CLEAN-OUT (FLOOR OR YARD) 8. PLUMBING CONTRACTOR SHALL SPECIFY CONNECTION MATERIAL/TYPE WHEN ORDERING O oco <br /> TYPE K COPPER TUBING OR COPPER PIPE, POLYETHYLENE (PE) OR CPVC. 9. PLUMBING CONTRACTOR SHALL SPECIFY BURY DEPTH WHEN ORDERING w <br /> w O X o <br /> WCO WALL CLEAN-OUT J U w <br /> IF CPVC IS USED, FOAM INSULATION SHALL BE INSTALLED AT ALL CHANGES 10. PLUMBING CONTRACTOR SHALL PROVIDE GRID DRAIN, P-TRAP AND VALVE STOPS FOR ALL SINKS & LAVS N LTJ o o <br /> OF DIRECTION TO ACCOUNT FOR EXPANSION AND CONTRACTION. ® FLOOR DRAIN <br /> 3. INCOMING WATER SERVICE PRESSURE SHOULD BE BETWEEN 45 AND 55 PSI WSFU WATER SUPPLY FIXTURE UNIT(S) o <br /> z <br /> p4o <br /> STATIC. WHERE WATER PRESSURE SERVICE EXCEEDS 80 PSI STATIC, AN FLOOR SINK 0 <br /> APPROVED WATER-PRESSURE REDUCING VALVE WITH STRAINER CONFORMING == w <br /> TO ASSE 1003 SHALL BE INSTALLED. WHERE INCOMING WATER PRESSURE IS YC YARD CLEAN-OUTB U) GENERAL NOTES <br />
The URL can be used to link to this page
Your browser does not support the video tag.