| 
								    						ABBREVIATION   LIST   						GENERAL  NOTES   							SCOPE  OF  WORK    						PROJECT  CONTACTS     							SHEET  INDEX
<br />																																																															SHEET      SHEET TITLE       							1  2  3  4  5
<br />			A/C     AIR CONDITIONING			R	RADIUS    					1.   GENERAL CONTRACTOR SHALL VISIT THE SITE, REVIEW THE BUILDING     		INTERIOR TENANT IMPROVEMENT FOR AN (E)STARBUCKS COFFEE SHOP
<br />			ACT    ACOUSTICAL CEILING TILE      	REF     REFERENCE  					SHELL DRAWINGS AS SUBMITTED BY THE LANDLORD OR STARBUCKS      		SCOPE OF WORK IS COMPRISED OF: NEW NON-STRUCTURAL PARTITIONS, 																GENERAL
<br />			ADJ     ADJUSTABLE       			REQ'D  REQUIRED     					SITE SURVEYOR AND BECOME THOROUGHLY FAMILIAR WITH THE SITE    		EQUIPMENT, FIXTURES, FINISHES AND FURNITURE, EXTERIOR PATIO      																	G-0001      GENERAL INFORMATION
<br />			AFF     ABOVE FINISHED FLOOR		REV    REVISION      					CONDITIONS PRIOR TO BIDDING OR CONSTRUCTION.    					FURNITURE 														MAILING       	STARBUCKS COFFEE COMPANY    				G-0003      PRE-APPROVED CONST. MATERIALS
<br />			AMP    AMPERE     				FIND    ROUND      																																				ADDRESS:    	2401 UTAH AVENUE SOUTH
<br />       	rn      ARCH  ARCHITECT  												2.   GENERAL CONTRACTOR SHALL CONSULT WITH STARBUCKS     																							MS STOP:S-SD10							G-0004      PRE-APPROVED CONST. MATERIALS
<br />		T								SB      STARBUCKS   					CONSTRUCTION MANAGER TO RESOLVE ANY CHANGES,OMISSIONS  																						SEATTLE,WASHINGTON  98134     				G-0010      OUTLINE SPECIFICATIONS
<br />       	=      BOH    BACK OF HOUSE  			SC      SOLID CORE  					OR PLAN DISCREPANCIES PRIOR TO BIDDING OR CONSTRUCTION.   						PROJECT  DATA     									(206) 318-1575     							G-0011      OUTLINE SPECIFICATIONS
<br />       	-o 								SF      SQUARE FEET       																																																G-0012      OUTLINE SPECIFICATIONS
<br />		c      CAB    CABINET     				BHT    SHEET     					3.   ALL WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH
<br />			CL      CENTER LINE       			SIM     SIMILAR						LOCAL, COUNTY,STATE AND FEDERAL CODES AND ORDINANCES.      																																G-0014      OUTLINE SPECIFICATIONS										©zon srAHeucxs coFFee coMaArvv
<br />			CLG    CEILING      				SPEC   SPECIFICATIONPROGRAM    	MICHAEL MONTENEGRO      					G-0015      OUTLINE SPECIFICATIONS
<br />		o      CM      STA    	CONSTRUCTION  	SQ      SQUARE  					4.   GENERAL CONTRACTOR SHALL VERIFY THE LOCATION OF ALL       			LEGAL DESCRIPTION:     	APN: 17926052    								MANAGER:    	STARBUCKS COFFEE COMPANY    				G-0016      OUTLINE SPECIFICATIONS      								STARBUCKS COFFEE
<br />       	�     		MANAGEMANAGER    												UTILITIES.  																																17700 NEWHOPE STREET STE.200 FOUNTAIN   		G-0020      COMPOSITE PLAN
<br />       	=      CTR    CENTER      				TEMP  TEMPORARY     																			ZONING CODE:     		GENERAL COMMERCIAL																																					COMPANY
<br /> 																																																					VALLEY, CA 92708       						G-0021      OCCUPANCY& EXIT PLAN
<br />			CX      COMMISSIONING  			TYP     TYPICAL   					5.   GENERAL CONTRACTOR TO VERIFY ALL DIMENSIONS, INCLUDING       																						OFFICE:(714)885-3934 CELL: (949)243-1039
<br />       	Q  																															TYPE OF USE:      		COFFEE SHOP/RESTAURANT   																			G-0030      ADA NOTES
<br />			CXA    COMMISSIONING AGENT      										CLEARANCES
<br /> 																					TIONMAREQUIRED BYFANYDISCRTRADES AND
<br />    																											IESPRIOSTARBUCKS																						MMONTENE@STARBUCKS.COM 																				2401 UTAH AVENUE SOUTH
<br />       	r 								LINO    UNLESS NOTED OTHERWISE     		CONSTRUCTION MANAGER OF ANY DISCREPANCIES PRIOR TO
<br />																																																															G-0031      ADA NOTES   											SEATTLE, WASHINGTON 98134
<br />       	o  																															TYPE OF CONSTRUCTION:      TYPE 5																							G-0032      ADA NOTES
<br />       	W      DEG    DEGREE   													PROCEEDING WITH THE WORK. ALL DIMENSIONS ARE TO THE FACE
<br />       	a  																															#OF STORIES:     		1 DET     DETAIL       				VERT   VERTICAL      					OF THE FINISHED SURFACE UNLESS NOTED OTHERWISE. ALL  																																	G-0033      ADA INTERIOR DETAILS  											(206) 318-1575
<br />			DIA      DIAMETER   				VIF      VERIFY IN FIELD      				DIMENSIONS TO BETAKEN FROM DESIGNATED DATUM POINT. DO NOT    																		STORE 		KATIE RIFFKIN       																			iH    THESE DRAWINGS AND SPECIFICATIONS ARE
<br />       	o      DIM     DIMENSION       												SCALE DRAWINGS. 											SPRINKLERED:     		YES  										DESIGNER:   	STARBUCKS COFFEE COMPANY       			ARCHITECTURAL    												CONFIDENTIAL AND SHALL REMAIN THE SOLE
<br />       	LO      DM      STARBUCKS DESIGN MANAGER    																																											17700 NEWHOPE STREET STE.200 FOUNTAIN
<br />       	m      																																																												A-1001       ARCHITECTURAL SITE PLAN   								PROPERTY OF STARBUCKS CORPORATION,
<br />			DN      DOWN 													6.   GENERAL CONTRACTOR SHALL PATCH AND REPAIR ALL EXISTING      																						VALLEY, CA 92708
<br /> 																			WALLS, FLOORS,CEILINGS,OR OTHER SURFACES IDENTIFIED TO   			#OF EMPLOYEES/SHIFT:	4 														OFFICE :(714)885.3908       																				WHICH IS THE OWNER OF THE COPYRIGHT IN
<br />			EA      EACH       													REMAIN THAT MAY BECOME DAMAGED DURING THE COURSE OF THE  																						KRIFFKIN@STARBUCKS.COM   				INTERIORS    														THIS WORK. THEY SHALL NOT ,S
<br />     																																	TYPE OF OCCUPANCY:  	B   																																													HARED
<br />		O      EL       ELEVATION													WORK.      																																										1-1101       DEMOLITION FLOOR PLAN  								REPRODUCED (IN WHOLE OR IN PART),SHARED
<br />       	=      EQ      EQUAL 																																																																								WITH THIRD PARTIES OR USED IN ANY MANNER
<br />       	1:0OCCUPANCY LOAD: 																										1-1102       DEMOLITION REFLECTED CEILING PLANON OTHER PROJECTS OR EXTENSIONS TO THIS
<br />			EXIST  EXISTING     												7.   THE GENERAL CONTRACTOR IS RESPONSIBLE FOR OBTAINING   																																	I-1103       INTERIOR FLOOR PLAN   									PROJECT WITHOUT THE PRIOR WRITTEN
<br />       	p    																																															CONSTRUCTION    ALONSO MILAN
<br />       	an      EXT     EXTERIOR 													PERMITS FOR FIRE PROTECTION, PLUMBING, MECHANICAL,AND      																			MANAGER:    	STARBUCKS COFFEE COMPANY
<br />       	M																																RETAIL:  			15 S.F./60=     1     																					I-1104       PENETRATION PLAN      									CONSENT OF STARBUCKS CORPORATION.
<br /> 																			ELECTRICAL SYSTEMS PRIOR TO INSTALLATION OF SUCH SYSTEMS.   																						17700 NEWHOPE STREET STE.200 FOUNTAIN
<br />			FFBE   FURNITURE, FIXTURE,AND    																									SEATING:       		501 S.F./15=   34   																					1-1105       FF AND E PLAN  										THESE DRAWINGS AND SPECIFICATIONS ARE
<br />       	L																																BEVERAGEIPREP:    	191 S.F./200=  1    											VALLEY, CA 92708     																					INTENDED TO EXPRESS DESIGN INTENT FOR A
<br />       				EQUIPMENT    											8.   GENERAL CONTRACTOR SHALL RETAIN ONE SET OF THE PLANS TO    																						OFFICE:(714)885.3995  						1-1107       CASEWORK PLAN      									PROTOTYPICAL STARBUCKS STORE(WHICH IS
<br />  																																		B.O.H./STORAGE:     	301 S.F./200=  2
<br />       	Q      FLR     FLOOR     													NOTE AND DOCUMENT ALL CHANGES DURING CONSTRUCTION. THIS   			QUEUE:      			57 S.F./5= 49   											CELL:(714)290.9175     						1-1108       REFLECTED CEILING PLAN    								SUBJECT TO CHANGE AT ANYTIME)AND DO
<br />			FT
<br />			FT       FRONT OF HOUSE      											SET SHALL BEA PART     THE GENERAL CONTRACTOR'S"STORE																																	1-1109       REFLECTED CEILING PLAN-DIMENSIONS   						NOT REFLECT ACTUAL SITE CONDITIONS.
<br />       	U		FOOT/FEET       												CLOSE-OUT PACKAGE"A AS DESCRIBED IN THE CONSTRUCTION       			TOTAL INTERIOR OCC LOAD:  49 OCCUPANTS     																					1-1110       FLOOR FINISH PLAN   									NEITHER PARTY SHALL HAVE ANY OBLIGATION
<br /> 																			MANAGEMENT AGREEMENT.    																																																					NOR LIABILITY TO THE OTHER EXCEPT STATED
<br />       	p      G	GROUND  																																																									I-t111       WALL FINISH PLAN     														(
<br />     																																	TOTAL GROSS S.F.:       	0,766       									ARCHITECT OF      RUTH GARIBALDI, PM   																					ABOVE) UNTIL A WRITTEN AGREEMENT IS
<br />       	�,.�      GC      GENERAL CONTRACTOR 										9.   GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATING																				RECORD:      	VALERIO ARCHITECTS, INC.   					1-2101       INTERIOR ELEVATIONS      									FULLY EXECUTED BY BOTH PARTIES.
<br />       	cy       																DELIVERY OF MATERIALS FROM STARBUCKS CONTRACTED THIRD  			TOTAL INTERIOR SEATING:       														5858 WILSHIRE BLVD.STE.200 LOS ANGELES,   		I-2102       INTERIOR ELEVATIONS
<br />			HC      HOLLOW CORE  												PARTY LOGISTICS DISTRIBUTION SERVICES AND VENDOR DIRECT      																						CA 90036    								-2103       INTERIOR ELEVATIONS
<br />		G      HOW   HARDWARE       												SHIPMENTS. REFER TO CONSTRUCTION MANAGEMENT AGREEMENT   			PROPOSED INT. SEATING: 24 SEATS/09 TABLES    																																			STARBUCKS TEMPLATE VERSION 12017.05.18
<br />  																																		PROPOSED EXT.SEATING:18 SEATS/06 TABLES      										(323) 954-8996 x 129      						1-4101       ENLARGED RESTROOM PLAN AND ELEVATIONS
<br />		E      HM      HOLLOW METAL 												FOR METHODS AND LEAD TIMES.   																												(323) 9548965 FAX
<br />			HORIZ  HORIZONTALRGARIBALDI@V A L ERIOI NC.COM  				1-5001       DESIGN DETAILS-FRONTBAR
<br />		O      HR      HOUR  													10. RESPONSIBILITY FOR SUPPLY AND DELIVERY OF MATERIALS AND       																																1-5002       DESIGN DETAILS-BACKLINE
<br />       	p      HT      HEIGHT     													EQUIPMENT IS IDENTIFIED IN THE DRAWING SCHEDULE SHEETS 																																	I-5003       DESIGN DETAILS-BACKLINE     							mm
<br />		o      HVAC   HEATING,VENTILATING,AND AIR   									UNDER THE COLUMN LABELED"RESPONSIBILITY".						PLUMBING FIXTURES:    	OCCUPANCY LOAD CALCULATION  					MEP    		MILAN PESAKOVIC       						I-5004       DESIGN DETAILS-DRIVE THRU/BACKBAR
<br />       				CONDITIONING  																																										CONSULTANT OF   ACES ENGINEERING    						1-5005       DESIGN DETAILS
<br />    																		11. FOR THE PURPOSE OF THE DOCUMENTS,TO"INSTALL",SHALL MEAN    			INT. SEATING: 		501 S.F./30=   17								RECORD:      	3371 OLCOTT STREET,  						1-5010       FLOOR PENETRATION DETAILS   							5858 Wilshire Blvd #200      T: 323.954.8996
<br />			I.D.      INSIDE DIAMETER       											TO PROVIDE ALL FASTENERS,MISCELLANEOUS HARDWARE,      				EXT. SEATING:		256 S.F./30=   8    											SANTA CLARA, CA 95054
<br /> 																			BLOCKING, ELECTRICAL CONNECTIONS, PLUMBING CONNECTIONS,      			REMAINING:    		1,009 S.F. /200=5    																					1-5011       FLOOR FINISH DETAILS
<br />		c      																																																		(408)522-5225X123 PHONE       																			Los Angeles, CA 90036      F: 323.954.8965
<br />		p      LEED   LEADERSHIP IN ENERGY AND       									AND OTHER ITEMS REQUIRED FOR A COMPLETE AND OPERATION				TOTAL: 					=   30   											MILAN@ACIES.NET      						1-5020       WALL FINISH DETAILS
<br />       	U     		ENVIRONMENTAL DESIGN       									INSTALLATION, UNLESS OTHERWISE NOTED.												(15 MEN, 15 WOMEN)       																				I-5030       CEILING DETAILS     									www.valerloinc.com • info@valerioinc.com
<br />       	It      LL       LANDLORD
<br />       	0       																																																												1-5031       CEILING DETAILS
<br />    																		12. ALL ITEM SUBSTITUTIONS MUST BE APPROVED BY THE STARBUCKS   											REQUIRED PROVIDED																																ARCHITECT
<br />       	o      MAX    MAXIMUM  													DESIGN MANAGER.     																																								1-5040       CASEWORK DETAILS   									OFRECORD 	4,0"o   -
<br />       	M      MEP    "MECHANICAL, ELECTRICAL,      																													WATER CLOSETS:  																					I-6001       SCHEDULES    													�CJOVo Vg4t `rf�
<br />       	9     		AND PLUMBING"       										13. REFER TO ITEM CUTSHEETS FOR ADDITIONAL INFORMATION.       									MALE 1:1-50       	1 	1   																		1-6002       SCHEDULES  													W  D LIC. No.
<br />       	00      MFR    MANUFACTURER
<br />   																																							FEMALE 1:1-25   	i 	1																																					24226  0 (7
<br />       	p      MIN     MINIMUM
<br />      																																						LAVATORIES:   																					MECHANICAL      																EXPIRES     H
<br />       	r` 																																					MALE 1:1-150     	1 	1  																		M-1101      MECHANICALPLAN   													7a1-19      "
<br />       	N      NIC     NOT IN CONTRACT																																FEMALE 1:1-150  	1 	1       																																			`qP
<br />       	I`      NL      NIGHT LIGHT  																																																																												4
<br />       	NI     NTS     NOT TO SCALE     																																																							PLUMBING 																	OF(1+L14p
<br />       	Z      																																																												P-0001       PLUMBING SYMBOLS
<br />       	0_      OON CENTER       														BUILDING  CODES 				DEFERRED/SEPARATE   PERMITS
<br />       	3-      O..D.    OUTSIDE DIAMETER   																																																							P-0002      PLUMBING OUTLINE SPECIFICATIONS
<br />       	MI     																																																												P-0003      PLUMBING OUTLINE SPECIFICATIONS
<br />       	cD      PLC     PLACE     																																																									P-0004      SCHEDULES AND CALCULATIONS
<br />       	p      																																																												P-1101       PLUMBING SUPPLY PLAN
<br />     																		BUILDING CODE:     	2016 CALIFORNIA BUILDING CODE  																																		P-1103      PLUMBING WASTE AND VENT PLAN
<br /> 																							TITLE 24 PART 2
<br />		CDI
<br />  																																	FIRE ALARM AND   		G.C. SHALL SUBMIT FIRE ALARM 8 SPRINKLER      																P-5001       PLUMBING DETAILS
<br />		o  																PLUMBING CODE:    	2016 CALIFORNIA PLUMBING CODE  				SPRINKLER SYSTEM:      	PLANS AND OBTAIN APPROVAL PRIOR TO																																	�					�
<br />       	U)      																				TITLE 24 PART 5ELECTRICAL
<br />    																																						INSTALLATION. 																																											(V
<br />       	rnI     																																																												E-0001       ELECTRICAL NOTES  										`
<br />       	m   																																																																																Q
<br />     																		MECHANICAL CODE:	2016 CALIFORNIA MECHANICAL CODE 									SITE ADA UPGRADES, IF ANY REQUIRED,ARE       																E-0002      ELECTRICAL OUTLINE SPECIFICATIONS							r
<br /> 																							TITLE 24 PART 4    							SITE WORK: 			TO BE BY LANDLORD UNDER SEPARATE      																	E-0004      ELECTRICAL ENERGY CODE FORMS      											L�
<br />    				RESPONSIBILITY  LEGEND
<br />       	=  																ELECTRICAL CODE:  	2016 CALIFORNIA ELECTRICAL CODE  									PERMIT.       										San Joaquin County       									E-0005      ELECTRICAL ENERGY CODE FORMS  													Q
<br />																																																		Environmental Health Deparhnant
<br />       	-p      																				TITLE 24 PART 3 																								En18M E.Hazelton Ave.       									E-0006      ELECTRICAL POWER DISTRIBUTION FORMS   						�    			�	0
<br />		toStodton,CA 95205       									E-1104      ELECTRICAL LIGHTING DESIGN      								x�(
<br />		�I  																GREEN CODE: 		2016 CALIFORNIA GREEN BUILDING CODE       																				(209)46&3620  										E-6001       ELECTRICAL SINGLE LINE DIAGRAM AND PANEL     					06    			�i	z
<br />       	v     	GC      GENERAL CONTRACTOR SUPPLIED AND INSTALLED  									TITLE 24 PART 11																																							SCHEDULES
<br />       			LL       LANDLORD SUPPLIED    																																							APPROVED WITH CONDITIONS																							0
<br />       	0   																																																																																=
<br />       			SB      STARBUCKS SUPPLIED, INSTALLED BY GC       																																																		E-6002      LUTRON CONTROL DIAGRAM
<br />     																		FIRE CODE:    		2016 CALIFORNIA FIRE CODE TITLE 24 PART 9     																				pp   											E-6003      LUTRON CONTROL DIAGRAM      								Q    			LU	Y
<br />  		I    	DC      DISTRIBUTION CENTER																																							Fw noneeona,please aaaa  r°vananar dated:finsne
<br />       	U    	WH     STARBUCKS WAREHOUSE(3PL)								ENERGY CODE:       	2016 CALIFORNIA ENERGY CODE TITLE 24 PART 6     																Approved by: st¢ hGit!¢ ;�(4N1%V¢LData:Jun 15.2018   							E-6004      LUTRON CONTROL DIAGRAM      								O     		W       	0
<br />       			VD      STARBUCKS VENDOR DIRECT SUPPLIED, INSTALLED BY GC
<br />       	NI    	CW     CASEWORK VENDOR SUPPLIED, INSTALLED BY VENDOR/GC 																																																															M     		Im       	�O
<br />     																									OCCUPANCY  &   EXITING   DIAGRAM       										VICINITY  PLAN  																				z   LL     		¢   � I_
<br />       	cn       			SYMBOL  LEGEND       																																																															w   =     		�   �  z  o
<br />   																																																																														U     		w   Lf)	a
<br />       	°     																																																	°�...... ._   ,9     																								Q     		a   �  LL  CE
<br />       	ccn      																							I   																																																			STORE #:   		10183
<br />																													•     									__       													M       w,.,     																						PROJECT #:      	27237-038
<br />		N 		NORTH       								DATUMCAS
<br />   																																																																															K CONCEPT:
<br />		2		ARROW       								POINT    																																		�^^  	,''      -•�'`
<br /> 																																									...r 								�.....	........ ^^       -m .   																							DESIGN MANAGER:
<br />       	0
<br />       	CD      		_     																		�   																																			_       																	DESIGN MANAGER 	M. MONTENEGRO
<br />    																																																																													ISSUE DATE
<br />       	o       																																																				-  																						LEEDR AP.
<br />       	y 																							i 																												o
<br />    																																																																													PROGRAM MANAGER:
<br />       	AD
<br />       							O																																												..._..,	-      																						CHECKED BY: 		VALERIO
<br />  				EXTERIOR     	INTERIOR     	SECTION 		DETAIL   																																																																Revision Schedule
<br />       	Q       	ELEVATION   	ELEVATION   	CALL-OUT      	CALL-OUT
<br />  				CALL-OUT     	CALL-OUT  																																																																				Rev     				cription
<br />     																																																																														Date    By      	Des
<br />		N    																															®      				-    													,.,.,.																									05-23-18 SS   90 PERCENT CD SET
<br /> 																																		J     																				o																							06-06-18 SS   1 ST SUBMITTAL SET
<br />       	i
<br />  														/�      																							. .
<br />       				XX 		XXXX AFF 		X       																																											,�
<br />    				SHEET   	ABOVE FINISH      	FINISH		REVISION																																									oM     									DISCLAIMER
<br />     				NOTE 		FLOOR 		FACETO		CLOUD       																																--a 																												SHEET TITLE:
<br />  				CALLOUT  	HEIGHT TAG       	FINISH       															-  																																																	GENERAL  INFORMATION
<br />       	0-									FACE
<br />       										DIMENSION       															1*, -'  -``   RETAIL  		®   B.O.H.       			AREAS NOT CALCULATED    																	THESE DRAWINGS ARE BASED ON A COMBINATION OF ARCHIVED CAD FILES AND
<br />       	No      																																						IN OCCUPANCY LOAD:401    																	PHOTOS PROVIDED BY STARBUCKS COFFEE COMPANY.A SITE SURVEY WAS NOT       SCALE:AS SHOWN
<br />     				APXXX-ES 	Pxwo� 	DXXXXX       (W XXXXX      														BEVERAGE/PREP   ®   SEATING   			S.F.																					PERFORMED BY VALERIO ARCHITECTS FOR THIS PROJECT. EXISTING STRUCTURAL,
<br />       	CD     																																																												MEP CONDITIONS AND ALL DIMENSIONS TO BE FIELD VERIFIED BY THE GENERAL
<br />   																																																																													rET NUMBER:
<br />       	a0																																																													CONTRACTOR PRIOR TO DEMOLITION
<br />      																																																																					/FABRICATION/NEW CONSTRUCTION/
<br />  				REVISION	PAINT  	DESIGN ID 	DOOR 	WINDOW     													�>   QUEUE LINE      	"�:-    PATIO SEATING: -----   PATH OF TRAVEL
<br />       	C   		TAG     	TAG       	TAG      	TAG      	TAG																																																																	G-0001
<br />
								 |