Laserfiche WebLink
Foods <br /> Nestle Foods Corp., 230 Industrial Avenue, Ripon, CA 95366 (209) 599-4161 <br /> December 16, 1988 <br /> Mr. Robert White <br /> 23363 Cypress Drive <br /> Ripon, CA 95366 <br /> Dear Mr. White: <br /> As you are aware from our recent discussions, we need to install, <br /> and have access to one additional (the 4th) groundwater monitoring <br /> well on your property in Ripon, CA. This well is required by the <br /> Central Valley Regional Water Quality Control Board (CVRWQCB) <br /> as part of an ongoing investigation to evaluate the extent of <br /> organic chemical migration in the aquifers in the area. <br /> Pitcher Drilling Company, has been retained by Nestle Foods to <br /> drill this monitoring well, and they are being provided with <br /> engineering and hydrogeological expertise by the consulting firm <br /> Of Camp Dresser and McKee. Both of these firms carry all appro- <br /> priate insurance coverage for this type of work. <br /> This monitoring well will be located just west of the east <br /> boundary, and south of the electrical pole on your property at <br /> Stockton Street in Ripon, CA, and identified as Parcel 259- <br /> 320-26 on the assessor' s map. This well will initially be <br /> drilled to a depth of 300 ft. as an exploratory well and then be <br /> converted to a monitoring well to a depth of 180 feet. The well <br /> will be finished off flush to the ground and�,will be locked to <br /> prevent unauthorized access. Water samples collected from the <br /> well will be analyzed by EPA method with specific emphasis <br /> on the determination of concentrations on: <br /> trichloroethylene, 1, 1, 1-trichloroethane, trans-1, 2-dichlo- <br /> roethylene, and vinyl chloride. In addition, water level <br /> measurement will also be taken. <br /> Copies of all well drilling/logging data and analytical results <br /> that are submitted to the CVRWQCB will also be forwarded to you <br /> upon request. <br /> Nestle Foods agrees to indemnify you from any loss or expense <br /> arising out of drilling, operating, and maintaining of this <br /> monitoring well on your Ripon property, as contemplated by <br /> this letter. <br /> Please acknowledge your approval for Pitcher Drilling Co. /CDM to <br /> install the above-referenced monitoring well on your property <br /> by signing on the next page and returning a copy of this letter <br />