GENERAL NOTES Conform to the CBC Section 1505 for attic access doors and attic ventilation PROJECT INFORMATION REVISIONS BY,
<br /> requirements. Provide and install nonferrous wire mesh screens at all attic
<br /> THIS PROJECT SHALL COMPLY WITH C.A.C. TITLE 24, THE vents. Where combustion air to furnace is taken through attic vents, area shall
<br /> FOLLOWING CODES AND ALL MUNICIPAL ORDINANCES: be 1 square inch of vent for each 10 square feet of attic area. Provide and PROJECT DESCRIPTION: THE PUROPSE OF
<br /> • 2016 CALIFORNIA BUILDING CODE (CBC) install 4 inch diameter dryer vent to the exterior. THESE IMPROVEMENTS ARE FOR THE
<br /> 2016 CALIFORNIA PLUMBING CODE DISTRIBUTION OF HERBALIFE PRODUCTS-
<br /> 2016 CALIFORNIA MECHANICAL CODE GREEN CONSERVATION
<br /> • 2016 CALIFORNIA ELECTRICAL CODE Where a local jurisdiction does not have a construction & demolition waste CONSTRUCT NEW BAR COUNTER FOR NON j
<br /> 2016 CALIFORNIA GREEN BUILDING STANDARDS CODE management ordinance, submit a construction waste management plan for ALCOHOLIC BEVERAGES (FOR TEAS,
<br /> • 2016 CALIFORNIA ENERGY CODE approval by the enforcement agency that: SAN JOAQUIN COUNTY
<br /> • 2016 CALIFORNIA FIRE CODE SHAKES & NUTRITIONAL LIQUID
<br /> 1. Identifies the materials to be diverted from disposal by efficient SUPPLEMENTS ENVIRONMENTAL HEALTH DEPARTMENT
<br /> All work shall comply with these General Notes and applicable portions of all usage, recycling, reuse on the project or salvage for future use or ) 1888 E. TON, CAHAZELTO5205
<br /> building codes and ordinances, OSHA, CALOSHA, FHA and all local codes sale. STO209)46 CA 95205
<br /> (209)468 3420
<br /> and ordinances 2. Determines if materials will be sorted on-site or mixed ZONING: C2 �
<br /> 3. Identifies diversion facilities where materials collected will be taken. ❑Approved
<br /> B submittinghis bid each contractor and/or subcontractor states that he has OCCUPANCY: B/M Approved with changes: See Remarks
<br /> By 4. Specifies that the amount of materials diverted shall) be calculated by
<br /> visited the site and is familiar with the local conditions. PP ro d,See Rem s
<br /> weight or volume, but not by both. TYPE OF CONSTRUCTION: V-N oisapp ye t
<br /> In case of a conflict between two arts of the drawings or between the Documentation shall be provided to the enforcing agency which R marks ?X
<br /> p g P FLOOR AREA: W 00
<br /> drawings and these General Notes or specifications, the contractor or demonstrates compliance with Section 5.408.2, items 1 thru 4. The waste o
<br /> 640 S.F.
<br /> fn
<br /> subcontractor shall be deemed to have bid the more costly alternate, but shall management plan shall be updated as necessary and shall be accessible MAIN FLOOR rT} ry W
<br /> not proceed with the Work until verifying the proper procedure with the Owner. during construction for examination by the enforcing agency. LOFT (N.I.C.) 182 S.F. Date BY ` i W tHt��
<br /> Each subcontractor is responsible for his own clean-up, and shall remove all Appro a ends only to that which is shown and described � � G7 �G
<br /> waste and debris resulting from his work. Recycle and/or salvage for reuse a minimum of 50 percent of the non- hereon and does not authorize or approve any omission or
<br /> hazardous construction or demolition debris, or meet a local construction and BUILDING HEIGHT: 24' deviationfromrequirements ofstate lawsorlocal ordinances.
<br /> O
<br /> No changes in specified materials may be made without prior consent of the demolition waste management ordinance, whichever is more stringent. SPRINKLER SYSTEM: NO H U 04
<br /> Calculate the amount of materials diverted by weight or by volume, but not �
<br /> Owner. both OCCUPANT LOAD r� W Z 0
<br /> Each subcontractor shall commence work within 48 hours of notification by the TOILETS 1 1^ ® � ® U (�
<br /> General Contractor and shall diligently pursue his work with adequate Exceptions: 1. Excavated soil and land clearing debris GENERAL 576/100 = 6 1� Wj
<br /> manpower until complete and necessary inspections have been passed. 2. Alternate waste reduction methods develo ed with the
<br /> Scope of Work contemplated by these General Notes and drawing is a local agency if recycling or diversion facilities do not exist. TOILET 64/300= 1 0 rA �N U
<br /> U
<br /> completed building, ready for occupancy and safe use by the Owners. TOTAL: 8 F 4
<br /> For excavated soil and land clearing debris 100 percent of trees, stumps, E.{ r 1 '
<br /> Each subcontractor shall maintain public liability and workman's compensation rocks and associated vegetation and soils resulting primarily from land V/ Q:
<br /> insurance in amounts satisfactory to the General Contractor; shall take all Cn
<br /> clearing shall be reused or recycled. For a phased project, such materials NO. OF REQUIRED EXITS: 1 /- W
<br /> prudent measures to safeguard adjacent public and private property; and shall may be stockpiled on site until the storage site is developed.. NO. OF EXITS: 1 { ',�
<br /> be solely responsible for the proper behavior of his personnel.
<br /> Written dimensions take precedence over scaled ones, those on larger scale
<br /> drawings over smaller scale drawings. In addition to specific details of drawing SHEET INDEX
<br /> or notes, each subcontractor supplying work exposed to the weather shall be n/
<br /> responsible to provide all labor and materials required to make his part of the (- ,1 1L
<br /> job weather tight. Al FLOOR PLAN, GENERAL V
<br /> The work of each subcontractor shall be deemed to be guaranteed in NOTES & DETAILS
<br /> compliance with California law for a minimum of one year from date ofA2 STANDARD HANDICAP z o 2
<br /> i r p cz
<br /> acceptance by the Owner, except for longer guarantee periods, where set forth 00 z v-
<br /> in these notes, may be required of some trades. DETAILS .._-_.... t FLOOR PLAN KEY NOTES Z ¢ o
<br /> _ -- - 15 �+ r� -tom I Z u� w o
<br /> Each subcontractor, by commencing the work on his trade verifies that he P I PLUMBING PLAN T I� -vw I `A d e SCOPE OF WORK ¢ _ 0 �
<br /> has inspected and accepted the work of his prior trades. Prior work not 1. CONSTRUCT NEW COUNTER FOR SERVING ~ ~ m =
<br /> acceptable to a subcontractor shall be brought to the attention of the General El ELECTRICAL PLAN NUTRITIONAL SHAKES&TEAS O O (J ~ ~
<br /> Contractor and Owner in a time) manner for direction on proper procedure. I - o 0 o
<br /> Y P p p GL1�C 7� �aT 6► a � o W
<br /> In case of a conflict between two parts of the drawings or between the ��-I fo r Tu `7" 2. REMOVE EXISTING COUNTER& SINK- W .2
<br /> drawings and these General Notes, the Contractor shall contact the Architect REPLACE WITH NEW MOP SINK& CONNECT TO o m O ~ <
<br /> EXISTING PLUMBING cz m a
<br /> for clarity prior to any mater als purchase or installation. r e = z OZ Z
<br /> CONCRETE&FOUNDATION I ,x b � 140 2 H� 3 NEW SERVICE SINK-CONNECT TO EXISTING a a o
<br /> All concrete shall have a minimum ultimate concrete strength of 2,500 psi ina 6 ="o Q a
<br /> If 4. INSTALL NON-SLIP TILE FLOOR FOR NEW
<br /> 28 days. All concrete shall have a minimum of a 5-sack mix. All placement of 0
<br /> y KITCHEN
<br /> concrete shall meet or exceed the requirements of the California Building N ZX4 KI Qr---S-TU L;i m
<br /> Code. All concrete surfaces shall be protected & cured in accordance with 5. FILL IN EXISTING DOORWAY-SEE DETAILS p O d w
<br /> accepted building practices. Footings shall have a minimum of two (2) t - o f° w o :
<br /> continuous no. 4 steel reinforcing as shown on the footing details (U.N.O.) X I � �U u 8. CONSTRUCT NEW DOORWAY WITH CASED � �
<br /> OPENING
<br /> WOOD& FASTENERS
<br /> All framing members shall be Douglas-Fir grade No. 2 or better (U.N.O.) = I ' _ I EQUIPMENT
<br /> Framing lumber shall have 19% maximum moisture content at time of v - - � P�Ot) (- 'MTC F't 10. EXISTING ELECTRICAL PANEL- SEE
<br /> installation and fabrication. {Gv7 ELECTRICAL PLAN
<br /> All structural fasteners and connectors shall be installed per manufacturer's C5`-('O,, e7o^l`b -MA76H 11. EXISTING HVAC ON ROOF
<br /> instructions. BASEMENT
<br /> ( GT IN�, 12. EXISTING 30 GAL. GAS WATER HEATER IN
<br /> FINISH HARDWARE �+ (`M 13. NEW LAVATORY-STORTEC-HANK SINK WITH
<br /> Finish hardware shall conform with the CBC, local codes and ordinances, - 2x,4 s-rL c)D 6 ICO oc, FAUCET HSS17BC-NSF APP'D. � "I
<br /> whichever is more stringent. 14. NEW COMMERCIAL ICE MAKER BY OWNER W Q
<br /> Install Schlage hardware to new and existing doors or as directed by Owners15. NEW 3 TANK STAINLESS STEEL SINK, NSF Z
<br /> to match existing. I<3`�'� �� LL �TE 0� mL. APPROVED Z E
<br /> �i
<br /> 16. NEW WALL MOUNTED TV BY OWNER �
<br /> Weatherstrip all doors at perimeter of heated or cooled rooms, specifications n 17. NEW INSTAHOT HOT WATER UNIT
<br /> to comply with Title 24, Energy Conservation regulations. ---- /L>- rTo- k1 -5- ICod 18. NEW COMMERCIAL COMPACT FREEZER O W C) .,
<br /> GYPSUM WALLBOARD I�
<br /> Gypsum wall board shall conform to the California Building Code for single -- HAI L� CABINETRY � a U
<br /> ply applications. Joints shall be treated with tape and compound, nails or ;V j ��_ N -gam ��� 20. NEW BASE CABINET-SET COUNTER HEIGHT U Q
<br /> screws shall be recessed and treated with compound so as to be invisible TO +34" (MAXIMUM) FOR ADA COMPLIANCE O
<br /> after finish texture or painting -- 21 42" HIGH BAR COUNTER a "
<br /> DOORS&WINDOWS DOORWAY INFILL 22. NEW ADJUSTABLE SHELVES BELOW COUNTER r t
<br /> Windows shall be made of aluminum extrusions. Comply with certification WALL FRAMING ELEVATION W
<br /> and labelingrequirements of ANSI At 34.4 for air infiltration. SMOOTN GYP. BD. WALL __-- REQUIRED CODE ITEMS H O
<br /> CEILING PCA�L_� ; I//LR 6 I I_p( r. II r,+i 40. A REQUIRED 60" MINIMUM LEVEL PAVED AREA I+rl
<br /> Glass shall meet the requirements of the California building Code, Chapter AT ALL EXTERIOR DOORS USED BY THE +
<br /> 24 for size and strength. All fixed glass shall be set in aluminum frames IS"xso' _ PUBLIC (EXISTING)
<br /> unless otherwise noted. MIRROR 41. EXISTING DOOR WITH PUSH-PULL HARDWARE
<br /> HVAC 49" NT ,
<br /> 42. PROVIDE & INSTALL SIGN OVER DOOR: "THIS
<br /> Heatingand/or air conditioning work and equipment shall comply with the FRP PAFER DOOR TO REMAIN UNLOCKED WHEN BUILDING
<br /> 9PY TOWELSIS OCCUPIED"
<br /> wairuscoTT
<br /> California Mechanical Code, Title 24 Energy Compliance and other ,
<br /> applicable local codes and ordinances as applicable. -- - 43. PROVIDE & INSTALL FRP PANELS IN TOILET
<br /> J ABOVE EXISTING TILE BASE-REFER TO
<br /> 3e"' LONG GRAB ( INTERIOR ELEVATIONS
<br /> ELECTRICAL
<br /> Electrical work, shall comply with the California Electrical Code and all local _ ; ! -- c-- - µ ---1 GENERAL NOTES [�
<br /> 9 F I I O
<br /> UL label wherever applicable.
<br /> MATERIALS, HARDWARE, FIXTURES, ETC., Z
<br /> Receptacles shall be installed a minimum of 15" above finish floor as
<br /> codes and ordinances. Materials and devices shall be new and shall bear the A. CONTRACTOR TO REVIEW ALL FINISHES,
<br /> N \ N O WITH THE OWNER PRIOR TO FABRICATION OR a
<br /> applicable. - I INSTALLATION WHERE DECORATOR SHEETS
<br /> ARE NOT PROVIDED.
<br /> There shall be required exit illumination along the means of egress, including - - - - 21 \,,�/
<br /> B. SQUARE FOOTAGES:
<br /> the discharge per CBC Section 1006.1. Exit illumination shall have an5^ MIN cE�. 11-F_ NETRY MAY BE
<br /> BASE BOARD WINs II EXISTING FLOOR PLAN 640 S.F.emergency power supply to maintain power for a minimum of 90 minutes. I'-rr"(Typical where 2 exits are required) L 1-- -- � C. 3 PERCEDED BY NBTIERIOR ELEVATIONNOTES. FIELD VERIFY PRIOR TO FABRICATIONIJ�TH & PLASTER (G � � i-- - -J I � Z
<br /> Lath and plaster shall conform to CBC Chapter 25. r -ly
<br /> Plaster shall be applied over asphalt building paper when installed over wood l ( 13 2 d& �It/IC4 _1� V1
<br /> framed walls. Plaster shall consist of a base coat, color coat and a color coat to SMCOTN G4P. BD. WALL e 2I Lp 2 7 - - - - -I to 0
<br /> a minimum thickness of 7/8". No base coat shall be required over masonry. c@ILiNo _ B OI
<br /> Use 2 layers of Grade D paper when installed over IPsheathing. Cj� �AK pI j I� (� I kI-TcHr_ -]
<br /> TWA' I ----" -
<br /> s at
<br /> m ds Is lapping concrete foundations aProvide and install galvanized rm minimum1",beads
<br /> corner Prrovd scrub coat dfin+sh . TOIET Ori^ PT.-rill-6 rIL.I ® 15 W
<br /> UPS, p A
<br /> on exposed concrete stem walls. Weep screed shall terminate 2" above SEAT wFIW�-1 a
<br /> RT 2 v
<br /> adjacent concrete slab where occurring, 4" above adjacent earth. '.COVER
<br /> 8
<br /> Provide cement plaster over asphalt felt backed wire to 6" above finish floor
<br /> "3 line at tubs and showers to receive ceramic wainscot. y ------- ----- ------ --- - -- ---- - �
<br /> a 48" LONG GRAB 1 -- _. _ J LIL f 11104,011 .
<br /> 5 Where noted on the drawings stucco plaster shall be applied over 1" rigid °R "
<br /> OW insulation board. - E]T.P0 I ( I II
<br /> z _F
<br /> SHEET METAL&FLASHING o 0 � v- ---_-_ - p ARC D,ewn
<br /> �� E
<br /> All sheet metal work shall conform to CBC Chapter 14 and Chapter 15. All0Ny�'Tc��,�
<br /> flashing shall be 26 gage galvanized, unless otherwise noted. Flash all valleys, 3Hc�L
<br /> hips and ridges and intersections of roofs with vertical surfaces.
<br /> Flash around all exterior openings with T ex or waterproof building y° MIN. ct t. TILF I - - -- t-.
<br /> pEM�L IS� }� V`�,�+.L. � 1.- 26R75 sheetxember
<br /> Yv p 9 Paper, - - - - -
<br /> BASE BOARD 24"
<br /> v Sisalkraft ora approved equal. g P p ^ WALLS
<br /> Provide & install galvanized iron diverters where shown on the roof plan. _ EN. A P
<br /> blocks as shown on the tans. AnA �c CC FE I �L.= 9T APa\
<br /> Provide and install galvanized rain utters, downspouts and concretes lash
<br /> P L- �E7 T FOFCp,
<br /> F
<br /> 0
<br /> 517771177 177 NO 101 1<
<br />
|