My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008 RETROFIT
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1553
>
2300 - Underground Storage Tank Program
>
PR0516526
>
COMPLIANCE INFO_2008 RETROFIT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 11:26:32 AM
Creation date
12/13/2018 1:04:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 RETROFIT
RECORD_ID
PR0516526
PE
2361
FACILITY_ID
FA0012659
FACILITY_NAME
LOVE'S COUNTRY STORES OF CALIF #223
STREET_NUMBER
1553
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24534024
CURRENT_STATUS
01
SITE_LOCATION
1553 COLONY RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County DIRECTOR <br /> Environmental Health Department Donna Hera RENS <br /> �O._�•..CD ASSISTANT DIRECTOR <br /> Z..' <br /> .' Z� 600 East Main Street Laurie Cotulla, REHS <br /> III7 :{ Stockton, California 95202-3029 PROGRAM COORDINATORS <br /> .1 AL1 <br /> Carl Borgman, REHS <br /> c•, �_ p Mike Huggins, REHS, RDI <br /> FOR�` Website: www.sjgov.org/ehd Margaret Lagorio,REHS <br /> Phone: (209)468-3420 Robert McClellon,REHS <br /> August 15, 2008 Fax: (209)464-0138 Jeff Carruesco, REHS,RDI <br /> Kasey Foley, REHS <br /> Slunaker Construction <br /> 3642 Chicago Avenue <br /> Riverside CA 92507 <br /> Attn: Doug Thane <br /> Re: 1553 Colony Road, Ripon CA SR0055127 <br /> Sent Via Fax <br /> The San Joaquin County Environmental Health Department (EHD) has completed the <br /> review of the application for permit to perform an ISD/EVR Phase 1I upgrade and cold <br /> start at the above noted address. The permit has been approved with the following <br /> conditions: <br /> 1. Contact the local fire department Local Planning or Building Department, and the <br /> San Joaquin Valley Air Pollution Control District for any applicable permits and <br /> requirements. <br /> 2. Contact Michelle Henry at(209) 953-7699 to arrange the following inspection <br /> appointment(a 48-hour notice is required for inspection appointments): <br /> a. Functionality test to ensure that monitoring has been restored to meet the <br /> requirements of California Code of Regulations Title 23 and the Health & <br /> Safety Code. <br /> 3. Any changes in information and scope of work must be submitted to EHD for <br /> approval prior to commencing work. All new addenda supersede the previous <br /> ones. <br /> 4. If concrete is broken near the UST or product lines, a tank integrity and/or line <br /> integrity test (or equivalent)must be performed, once concrete is poured in <br /> accordance with the manufacturer's guidelines. Results must be received by EHD <br /> within seven days of returning the facility to operating condition. <br /> 5. Qualified installers and service technicians must possess or work under the direct <br /> and personal supervision of an individual physically present at the work site, at all <br /> times while work is being performed, who possesses all of the following: <br /> a. One of several permissible valid, current contractor's licenses issued by <br /> the Contractors State License Board (may be issued to the installation <br /> company), and <br />
The URL can be used to link to this page
Your browser does not support the video tag.