Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes 0 <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested <br /> Test Method Developed By: 0 Spill Bucket Manufacturer 0 Industry Standard Al Professional Engineer <br /> 0 Other(Specie) <br /> Test Method Used: 0 Pressure 0 Vacuum Hydrostatic <br /> 0 Other(Spec) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill 7� - <br /> Wait <br /> Spill Boz#2..b F Spill Box#3 A F Spill Bog# <br /> Bucket Diameter: l/ i i t'r <br /> Bucket Depth: 13 time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(RI): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-RI): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: 0 Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass: 0 Fall <br /> Comments— include information on repairs made prior to testing, and recommended ollow-u or ailed tests <br />