My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008 RETROFIT
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1553
>
2300 - Underground Storage Tank Program
>
PR0516526
>
COMPLIANCE INFO_2008 RETROFIT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 11:26:32 AM
Creation date
12/13/2018 1:04:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 RETROFIT
RECORD_ID
PR0516526
PE
2361
FACILITY_ID
FA0012659
FACILITY_NAME
LOVE'S COUNTRY STORES OF CALIF #223
STREET_NUMBER
1553
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24534024
CURRENT_STATUS
01
SITE_LOCATION
1553 COLONY RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The FE Petro Mechanical Line Leak Detector I I <br /> HATURIS AND BENIFITS <br /> • Capable of detecting line leaks <br /> equal to 3 GPH at 10 psi(114 LPH 1'/2"HEX <br /> The FE Petro MLD product line has unique construction at.68bar). VERTICAL VENT TUBE DRIVE <br /> features designed to provide maximum flow rates in busy CONNECTION <br /> stations and long service life.Both are critical issues for • Once in the open position,MLD /""STAINLESS STEEL <br /> profitable station operation. remains open during product SOCKET IIEAD CAP <br /> delivery to pressures as low as SCREWS <br /> _ 1 psi.Therefore,the MLD will CAST IRON <br /> Design Features: not close when several nozzles COVER <br /> Q Piston design offers the maximum flow rate possible by are open at the same time. <br /> UL <br /> keeping now restriction through the leak detector at a ! ' LIP- <br /> minimum.Piston has a full P/0(4.1 cm)of travel to 3rd party certified to comply with <br /> P US EPA requirements 280.41 ODA2 <br /> move the leak detection poppet fully out of the flow 4 (B) 'I GAS <br /> path when product is being pumped. and 280.44(A)for continuous <br /> Q Piston cylinder has 5.75 cubic inches(942 cc)of monitoring of pressurized piping. <br /> volume to help minimize nuisance tripping due toUL listed for installation in all 4" BURNISHED Q <br /> — <br /> thermal contraction.This also reduces the number of — • <br /> FE Petro pumps and most ©THERMAL BRASS <br /> daily line tests during thermal contraction periods and (bNT1L4C110N , CYLINDER <br /> thereby extends the life of the leak detector. competitive makes. CpMPENSAMON <br /> CHAMBER f LINER <br /> • Compatible with all blends of <br /> Built-in precision to maximize life: motor fuels including alcohol <br /> BRASS blends from 0 to 100"ti ethanol or Q BRASS TEFLON' <br /> Q a <br /> Burnished Brass Cylinder Liner has n 8 to 24 micron POPPET methanol.20%MTBE or ETBE SEALS <br /> finish.The piston rod is polished stainless steel.Both PISTON 4 <br /> are designed to minimize friction by providing an FLOW FLOW with 80%gasoline,or 17^„'TAME <br /> with 83%gasoline as well as <br /> extremely smooth surface to reduce wear of the <br /> emtlseals. diesel,fuel oil,avgas,jet fuel, STAINLESS <br /> and kerosene. STEEL,NAME <br /> Q Metering Pin is constructed of 416 stainless PLATE <br /> steel to minimize wear of the critical 3 GPH hak MLD signals a line leak by allowing CAST IRON <br /> rate orifice. MLD shown in full flow position. less than 3 GPM(11.4 LPM) BODY _ SPRING <br /> Poppet fully out of flow stream. <br /> restricted flow rate,at leak sizes of <br /> 3 GPH <br /> Three MLD Models for the exact application* than 3 G greater.Leaks of less <br /> GPH are indicated by the <br /> • The MLD(blue in color)is leak detector taking longer than GROUND& STAI2"N— <br /> designed <br /> "N- <br /> 2 to 3 seconds too POLISHED en. <br /> designed for use in gasoline P PIPE Tli:- <br /> and alcohol blends and 100% STAINLESS <br /> alcohol applications using Time required to make a line testis STEEL PISTON &SEAL FITROD EXISTING <br /> ridged pipe,or flexible pipe 2 to 3 seconds when no line leaks PUMPS <br /> with a high modulus of exist and air is purged from piping. <br /> elasticity. CELCON' <br /> • The MLD-D(light tan in colo)is r • Maximum static head on MLD is SPRING <br /> designed for use in diesel fuel and approximately 10 feet(3.28 m) GUIDES <br /> kerosene applications only. e from MLD to the highest point in BRASS <br /> VITO <br /> • The MLD-E(gray in color)is designed the piping system. POPPET � O-RING <br /> for use with some flexible piping systems <br /> with a low modulus of elasticity. Weight:9.2 pounds(4.2 kg). <br /> Q STAINLESS STEEL <br /> *Always follow MLD installation instructions in flexible METERING PIN <br /> piping systems to determine if model MLD-E(gray),the t Minimum height requirement from • <br /> �� TEFLON BRASS CAGE <br /> standard MLD(blue),or MLD-D(tan)model is required to :n`, 2°NPT port to manhole cover for POPPET SEAL <br /> detect a 3 GPH line leak. �� e7 clearance is 9"(22.9 cm). <br /> l� <br /> /J� • Maximum product viscosity is <br /> 70 SRI I at.tit)'F(ISA'C). <br />
The URL can be used to link to this page
Your browser does not support the video tag.