My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008 RETROFIT
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1553
>
2300 - Underground Storage Tank Program
>
PR0516526
>
COMPLIANCE INFO_2008 RETROFIT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 11:26:32 AM
Creation date
12/13/2018 1:04:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 RETROFIT
RECORD_ID
PR0516526
PE
2361
FACILITY_ID
FA0012659
FACILITY_NAME
LOVE'S COUNTRY STORES OF CALIF #223
STREET_NUMBER
1553
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24534024
CURRENT_STATUS
01
SITE_LOCATION
1553 COLONY RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LV F. In-Tank Gauging/SIR L'v-ipment: U7 C;heck this box if'-mak gauging is used only for inventory control. <br /> ❑ Check this box i_ ank gauging or SITZ equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com lete the Ifollowiner checklist: <br /> ❑ Yes ❑ Ng* Has all input wiring been inspected for proper entry and termination, includingtestingfor <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildp? ground faults. <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were ali�items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Com lete the folio ing checklist: <br /> es ❑ No* For equipment start-up or annual equipment certif�i t�'on, was a leak simulated to verify LLD performance? <br /> E3 N/A (Check all that apply) Simulated leak rate: �p.h.; ❑ 0.1 g.p.h; ❑0.2 g.p.h. <br /> Ye No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> yes O No* Was the testing apparatus properly calibrated? <br /> Yes No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ N/A For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ Yes ❑ N * For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> /A or disconnected? <br /> ❑ Yes ❑ N * For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> N/A or fails a test? <br /> ❑ Yes N/A For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: w Cteh �4- <br /> .I— <br /> to 914 <br /> Page 3 of 3 <br /> 03101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.