Laserfiche WebLink
October 17, 2012 <br />San Joaquin County <br />Environmental Health Department <br />1868 East Hazelton Avenue <br />Stockton, California 95205-6232 <br />Walton Engineering, Inc <br />P O Box 1025 <br />West Sacramento, CA 95691 <br />Attn: Veronica Freitas <br />Website: www.sjgov.org/ehd <br />Phone: (209) 468-3420 <br />Fax: (209) 464-0138 <br />Re: Tiger Express <br />1399 Yosemite Avenue, Manteca <br />DIRECTOR <br />Donna Heran, REHS <br />PROGRAM COORDINATORS <br />Robert McClellon, REHS <br />Jeff Carruesco, REHS, RDI <br />Kasey Foley, REHS <br />Linda Turkatte, REHS <br />FELE COPY <br />SR0065801 <br />The San Joaquin County Environmental Health Department (EHD) has completed the review of <br />the application for a permit to replace all dispensers with the use of Bravo Conversion Frame, <br />perform a cold Start after an ISD upgrade, replace a direct bury spill bucket and replace a <br />99LD2000 VMI leak detector on the 91 turbine on the underground storage tank (UST) system <br />at the above noted address. The permit has been approved with the following conditions: <br />Contact the local fire department and the San Joaquin Valley Air Pollution Control <br />District for any applicable permits and requirements. <br />2. Any changes in information and scope of work must be submitted to EHD for approval <br />prior to commencing work. All new addenda supersede the previous ones. <br />3. Contact Muniappa Naidu at (209) 468-3439 to arrange the following inspection <br />appointments (a 48-hour notice is required for inspection appointments). Please be <br />aware that inspections for emergency work must be scheduled within five days of permit <br />approval. <br />a. Sensor functionality: Functionality of the monitoring system must be verified to <br />ensure that monitoring has been restored to meet the requirements of Title 23 <br />California Code of Regulations and the Health & Safety Code. A copy of the alarm <br />history shall be printed prior to performing the "cold start" of the Veeder Root system <br />and made available at the time of EHD inspection. <br />b. Leak detector test: Leak detector must be tested to confirm that the device can <br />detect a leak of 3 gallons per hour at 10 psi. All ready tested and passed during <br />monitoring certification. <br />c. Corrosion protection: Verify corrosion protection for direct bury spill bucket prior to <br />backfilling. <br />d. Spill bucket test: Verify minimum 5 -gallon capacity and pass a one hour hydrostatic <br />test (or equivalent). Proper drainage must also be verified. <br />Please be aware that the facility cannot operate the UST system prior to the EHD <br />inspection and approval. <br />