Laserfiche WebLink
OP''4u I N•.0 <br />SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />y. 600 East Main Street, Stockton, CA 95202-3029 <br />i Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sigov.org/ehd <br />09�iFOw�/ <br />UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br />Facility Name: <br />LL -C, <br />Inspection Date: <br />—201 <br />Facility Address: <br />t --�) ca "VIsJ� � �/ <br />Service Request #: <br />016 <br />Onsite Service Technician's Name: <br />ICC Service Technician/Installer Exp. Date: <br />Manufa ur r ng--71217,[2- <br />YZ <br />❑ line test programmed <br />01Z <br />01Z — <br />SERVICE <br />i <br />WEAM <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />- - <br />❑ electronic Serial #: <br />❑ line test programmed <br />❑ <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />❑ <br />❑ line test programmed <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ <br />❑ electronic Serial #: <br />❑ line test programmed <br />jes�N_- sensor GkYIYIUW,r. <br />❑ Model: VQ1 * q` 2KO —W <br />positive shutdown <br />❑ fail safe Serial #: <br />❑ <br />❑ NA <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ <br />❑ fail safe Serial #: <br />❑ <br />❑ NA <br />❑ <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Overfill prevention (see LG letter 150-1) <br />91 <br />SERVICE <br />i <br />WEAM <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />- - <br />❑ Caldwell System ❑ Other <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Primary piping testing at: <br />❑ <br />psi <br />minutes <br />Secondary containment testing for: <br />UDC(s) Piping <br />Sump(s) UST(s) <br />❑ <br />Testing for the above components are next due by: <br />Note: Please be aware that 21 containment components are required to be tested upon <br />installation, 6 months after. and every 36 months thereafter. <br />❑ <br />Cold start of monitoring panel <br />❑ <br />Corrosion protection <br />❑ <br />Other: see below <br />� rPALM <br />111=70=10 W4111 <br />i <br />WEAM <br />- - <br />EHD_1spector,-.: <br />� W�.AWJWWWJ� <br />EHD 23-04 <br />Rev 11/17//08 <br />Nb v�� r r r'i � �/ � � k feCfT SENA ERE I ES1tIN60elOtNREPORT <br />�M� "rS 4u --e RIC)M �2Z Ll . <br />