Laserfiche WebLink
I-, Eft -Tank Gauging 9 SIR Equipfnent- rr.ecK this box i? iank gauging is,uaod only for invRntory rontroi <br />ck <br />Chethis box if no tack gauging or SIR equipment is installed. <br />Tnls section roust be completed it in -tante gauging equdpmer<t is used to erform teak detection monitoring. <br />Complete the foliowi checklist: <br />Yes NO ° Has all input wiring been inspected for proper entry and termination, including t�5ttng or ground faults' <br />Yes No' Were ail tank gauging probes vi5uetly inspected #or damage and residue buildup? <br />Yes Nt4' Was accuracy of system product level mading-s tested? <br />Yes No` Was accuracy of system water level readings tested? <br />Yes No' Were all probes reinstalled property? <br />Yes No, Were tRl itEms on the ®quipment manufacturer's maintenance checklist completed? <br />b 11, the Section H, below, describe now and when ttmse deiiclenclei5 were or will be corrected. <br />G. Lino Leak Detectors (LLD), . Check: this box if LI -09 are not installeU, <br />tha fnilawinn checklist' <br />Yes <br />No' <br />For equipment start-up or annual equipment certification, was a leak sinnulat6d to v <br />NIA <br />thal apply) Simulated leak rate: .10 g.ta.h.; - 0.1 g.p.h ; ^ 0.2 g.p.h. <br />Were all LLDs confirmed operational and accurate within rogulatory raqu re nonts? f <br />Yes <br />No' <br />Yes <br />) No' <br />Was the testing apparatus property caiibrated? _ <br />i'; No" <br />For mechanical LLDs, does the LLD 1 restrict product flow if it detects a leak? <br />N/A <br />- <br />For electronic LLDs. does the turbine automatically shut off if the LLD detects a leak? <br />� No' <br />7Ye <br />NA rt No. <br />For electronic PLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br />NIA <br />disaonnacted? <br />t- No' <br />For electronic LLDs, does the turbine automatically shutoff if any portion of the monitoring system maifianciions or <br />NIA <br />fails a test? <br />Na' <br />For etec�ronic LLDs, nava all accessible wiring connections been visually inspected? <br />NIA <br />C No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? - <br />- in the ser-nan n, r)ety—, — IVIG 1— —v lo.. ­.- _ _. __ -- _ <br />H. GO(ttrt1WAB: <br />I <br />Mcmitwina System Certification Page 3 of a 32107 <br />3 <br />2121107 <br />