Laserfiche WebLink
ry 18, 2010 <br />San Joaquin County <br />Environmental Health Department <br />600 East Main Street <br />Stockton, California 95202-3029 <br />Website: www.sjgov.org/ehd <br />Phone: (209) 468-3420 <br />Fax: (209) 464-0138 <br />M V P Petroleum Engineering, Inc. <br />P O Box 281 <br />Folsom, CA 95763 <br />Re: California Gas Station, LLC <br />1399 E Yosemite Avenue, Manteca <br />DIRECTOR <br />Donna Heran, REHS <br />PROGRAM COORDINATORS <br />Robert McClellon, REHS <br />Jeff Carruesco, REHS, RDI <br />Kasey Foley, REHS <br />SR0059354 <br />The San Joaquin County Environmental Health Department (EHD) has completed the review of <br />the application for a permit to perform an EVR Upgrade with a Hirt System on the underground <br />storage tank (UST) system at the above noted address. No ISD upgrade. The permit has been <br />approved with the following conditions: <br />Contact the local fire department, Local Planning or Building Department, and the San <br />Joaquin Valley Air Pollution Control District for any applicable permits and requirements. <br />2. Any changes in information and scope of work must be submitted to EHD for approval <br />prior to commencing work. All new addenda supersede the previous ones. <br />3. Contact Muniappa Naidu at (209) 468-3439 to arrange the following inspection <br />appointments (a 48-hour notice is required for inspection appointments). Please be <br />aware that inspections for emergency work must be scheduled within five days of permit <br />approval. <br />a. Sensor functionality: Functionality of the monitoring system must be verified to <br />ensure that monitoring has been restored to meet the requirements of Title 23 <br />California Code of Regulations and the Health & Safety Code. A copy of the alarm <br />history shall be printed prior to performing the "cold start" of the Veeder Root system <br />and made available at the time of EHD inspection. <br />Please be aware that the facility cannot operate the UST system prior to the EHD <br />inspection and approval. <br />4. If concrete will be broken near the UST and/or piping, a secondary containment test <br />must be performed on the UST and/or piping once concrete is poured in accordance <br />with the manufacturer's guideline. <br />