Laserfiche WebLink
-2 - <br />and maintained as specified herein and in the following exhibits. Exhibit 1 contains a list of <br />the equipment certified for use with the VST Phase II EVR System. Exhibit 2 contains the <br />performance standards, specifications, and typical installation drawings applicable to the <br />VST Phase II EVR System as installed in a gasoline dispensing facility (GDF). Exhibit 3 <br />contains the manufacturing performance standards and specifications. Exhibit 4 provides <br />items required in conducting TP -201.3. Exhibit 5 is the liquid removal test procedure. <br />Exhibit 6 is the VST ECS hydrocarbon sensor verification test procedure. Exhibit 7 is the <br />VST and Veeder-Root Phase II EVR System Warranty. Exhibit 8 is the vapor pressure <br />sensor verification test procedure. Exhibit 9 is a test procedure for determining the VST <br />ECS vapor processor activation pressure. Exhibit 10 is the nozzle bag test procedure. <br />Exhibit 11 is the Veeder-Root vapor polisher operability test procedure. Exhibit 12 is the <br />Veeder-Root vapor polisher hydrocarbon emissions verification test procedure. Exhibit 13 <br />provides items required in conducting TP -201.4. <br />IT IS FURTHER ORDERED that compliance with the applicable certification requirements, <br />rules and regulations of the Division of Measurement Standards of the Department of Food <br />and Agriculture, the Office of the State Fire Marshal of the Department of Forestry and Fire <br />Protection, the Division of Occupational Safety and Health of the Department of Industrial <br />Relations, and the Division of Water Quality of the State Water Resources Control Board <br />are made conditions of this certification. <br />IT IS FURTHER ORDERED that VST and Veeder-Root shall provide a warranty for the <br />vapor recovery system and components to the initial purchaser. The warranty shall be <br />passed on to each subsequent purchaser within the warranty period. The manufacturer of <br />components listed in Exhibit 1 not manufactured by VST or Veeder-Root shall provide a <br />warranty to each of their components certified herein. The warranty shall include the <br />ongoing compliance with all applicable performance standards and specifications and shall <br />comply with all warranty requirements in Section 16.5 of the Certification Procedure. VST, <br />Veeder-Root, or other manufacturers may specify that the warranty is contingent upon the <br />use of trained installers. <br />IT IS FURTHER ORDERED that every certified component manufactured by VST and <br />Veeder-Root shall be performance tested by the manufacturer as provided in Exhibit 3. <br />IT IS FURTHER ORDERED that the certified VST Phase II EVR System shall be installed, <br />operated, and maintained in accordance with the ARB Approved Installation, Operation, <br />and Maintenance Manual. A copy of this Executive Order and the ARB Approved <br />Installation, Operation and Maintenance Manual shall be maintained at each GDF <br />where a certified VST Phase II EVR System is installed. <br />IT IS FURTHER ORDERED that equipment listed in Exhibit 1, unless exempted, shall be <br />clearly identified by a permanent identification showing the manufacturer's name, model <br />number, and serial number. Within 60 days after the issuance of this Executive Order, <br />VST and Veeder-Root shall provide a picture to ARB, in the format designated by the <br />Executive Officer or Executive Officer Delegate, showing permanent identification of each <br />component as listed in Exhibit 1. <br />VST Phase 11 EVR System not Including ISD — VR -203-E <br />