Laserfiche WebLink
SWRC$, January 2002 <br />5. SECONDARY PIPE TESTING <br />Page ?j of <br />Test Method Developed By: Piping Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: .Pressure r -__ _ .-. AVacuum ❑ Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: l"e SsU i - 1�ST /V i c '01 Equipment Resolution: V/I) - I <br />Piping Run #ONI L Piping Run #'L- Piping Run # 3 Piping Run # <br />Piping Material: <br />Piping Manufacturer: <br />Piping Diameter: <br />Length of Piping Run: <br />L) ),y Y, 2z) l <br />1. �' r , / ! q l <br />l � � L I � ! i ���� s % 7 �.� <br />F"o'".� 9� r � �Y ° l <br />Product Stored: <br />n <br />ll��!/ i�/P re�z�+'� <br />Cir �� Sd In1ti' <br />Method and location of <br />piping -run isolation: <br />4�- a.4 <br />r s� bcra� <br />Wait time between applying <br />ess acuum/water and <br />startin test: <br />u <br />Test Start Time: <br />Initial Reading (RD: <br />3 P51:7 <br />P 5-T— <br />P 5 � <br />Test End Time: <br />Final Reading (RF): <br />3 5:r-7 <br />t? ; S P 5 <br />P5 3 -- <br />Test <br />Test Duration: <br />I 1A OU p <br />I' o U V <br />Change in Reading (RF-RO: <br />Pass/Fail Threshold or <br />Criteria: <br />✓, SZ NO LbS i -N ST <br />byOInSS <br />Test Result: <br />Pgass ❑ Fail <br />ass ❑ Fail ass ❑ Fail <br />Pass ❑ Fail <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />