Laserfiche WebLink
SWRCB, January 2002 <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />Facility is Not Eauirmed With Snill/Overfill C'nntninmPnr Rn— n <br />Page 77 of a <br />Spill/Overfill Containment Boxes are Present, but were Not Tested <br />Test Method Developed By: 0 Spill Bucket Manufacturer 0 Industry Standard 0 ProfessionafEngineer <br />0 Other (Spec) <br />Test Metltod-Used: 0 Pressure 0 Vacuum 0 Hydrostatic <br />i_ 0 Other (Spec) <br />Test Equipment Used: ' "' <br />Equipmeni Resolution: <br />Sptll, 4oa # Spill Boz #' Spill Boz # Spill Boa # <br />Bucket Diameter: <br />Bucket Depth: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />= . <br />Test Start Time: <br />Initial Reading (R,): <br />Test End Time: <br />Final Reading (RF)?, <br />Test Duratippfi "' <br />Change,uAeading (RF -RI): <br />Pas ail Threshold or <br />Criteria: <br />Test Result: <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing and recommended <br />e 5 ""5 A-{, 8, (2: VLYt tk <br />