Laserfiche WebLink
a <br />F • In -Tank Gauging / SITZ Lqo eat:/ElCheck <br />heck this box if tank f ~ -ing is used only for inventory control. <br />this box if no tai.-auging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Comnlete the fow)win- cherlcli.st! <br />a <br />❑ Yes <br />❑ No* <br />Has all input wiring been inspected for proper entry and termination, including testing for -round faults? <br />❑ Yes <br />❑ No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes <br />❑ No* <br />Was accuracy of system product level readings tested? <br />❑ Yes <br />❑ No* <br />Was accuracy of system water level readings tested? <br />❑ Yes <br />❑ No* <br />I Were all probes reinstalled properly? <br />❑ Yes <br />❑ No* <br />I Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): <br />('mmnlete the fnllnwina rherklkt- <br />❑ Check this box if LLDs are not installed. <br />' * In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />Page 3 of 3 03/01 <br />❑ No* <br />For equipment start-up or annual equipment rtification, was a leak simulated to verify LLD performance? <br />❑ N/A <br />('heck all that apply) Simulated leak rate:7g.p.h.; ❑ 0.1 g.p.h ; ❑ 0.2 g.p.h. <br />V <br />❑ No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />❑ No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ N/A <br />❑ Yes <br />❑ o* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />N/A <br />❑ Yes <br />❑ o* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />N/A <br />or disconnected? <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br />N/A <br />malfunctions or fails a test? <br />❑ Yes <br />❑ o* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />N/A <br />Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />' * In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />Page 3 of 3 03/01 <br />