Laserfiche WebLink
Monitoring System Certification <br />Site Address: <br />Date of Testing/Servicing. <br />D. Results of Testing/Servicing <br />Software Version Installed: <br />Cooviete the foll! 'ng checklist: <br />122 .Yes ❑ No* <br />Is the audible alarm operational? <br />Yes O No* <br />Is the visual alarmoperational? <br />Yes ❑ No* <br />1 <br />Were all sensors visually ected, bnctio lally tested, and confirmed rational? <br />p Yes Q No* <br />Were all sensors installed at lowest point of secondary containment and positioned so that other <br />equipment <br />will not interfere with their Pro= omration? <br />❑ Yes ❑ o* <br />N/A <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br />C <br />operational? <br />Yes ❑ No* <br />❑ N/A <br />For pre urized piping kms, does the turbine automatically shut down if the m secon <br />(rip g containment <br />monitoring system detects a leak, fails to <br />some s <br />operate, or is electrically disconnected? [f yes: which sensors <br />initiate shut <br />positive -down? (Check all that apply) ❑ Sump/Trench Sensors; ❑ Dispenser Containment <br />Sensors. <br />Did you confirm positive shut -down due to leaks and sensor fail ure/disconnection. <br />� O Yes; ❑ No. <br />❑ Yes ❑ No* <br />Q N/A <br />For tank systems that utilize the monitoring system as the primary device <br />mechanical overfill prevention valve is installed), karmv�le and <br />is the overfiwarning a� the tank <br />fill point(s2 and o ratin 1 ? If so, at <br />❑ Yes* p No <br />what percent of tank capacity does the alarm tri er? ????"/o <br />Was any monitoring equipment replaced? If yes, identify <br />specific sensors, r or <br />laced and List the manufacturer name and for <br />0 Yes* 01�0 <br />lower equipment <br />model all replacement in Section <br />Was liquid found inside any secondary containment <br />systems designed as <br />❑ Product' ❑ Water. If es describe causes in Section E, below dry systems? (Check all that apply) <br />❑'Yes 0 No* <br />Was monitoring stem set-up reviewed to ensure se= s? <br />OJYes O No* <br />Is all monitorin& Equipmento rational per manufacturers cations? <br />* In Section E below, describe how and when these deficiencies <br />were or will be corrected, <br />E. Comments: <br />