Laserfiche WebLink
�Be sure to always READ THE DRAWINGS or plans to make <br />ILI J&MA JA sure that your mounting points are the same. Call Bravo <br />Systems if any problem occurs. <br />A2 - Position and bolt down conversion frame to the dispenser pan using the anchor plates of the <br />conversion frame with minimum 1/2" Diameter bolts. Use plastic caps to cover the bolts/nuts. <br />For Non -Bravo Sumps - A minimum of Four anchor bolts must be secured directly to concrete. <br />A3 - Adjust electrical conduits to line up with the new dispenser if necessary. <br />A4 - Pre -plumb all product inlets and vapor recovery line with offsets and/or rigid pipe and elbows <br />if necessary. <br />ff 'T DEPENDING ON NEW DISPENSER USED AND/OR <br />ERA OFFSET APPLICATION, THE RISER ON THE DISPENSER MAY <br />NEED TO BE SHORTENED TO ACCOMMODATE THE SPACE <br />TAKEN UP BY THE USE OF OFFSETS, ELBOWS, ETC... <br />A5 - Position and bolt down the dispenser to the conversion frame with the anchor bolts provided. <br />Dispenser <br />Base %— <br />Anchor Bolt <br />Anchor <br />Plate — <br />�l <br />Filter <br />Filter <br />Meters <br />Filter <br />BRAVO <br />OFFSET <br />BRAVO <br />OFFSET <br />Cocnrete Anchor <br />i Bolts <br />Equipment shown is for <br />illustration purposes only <br />and is not a reference <br />for your layout within <br />the hydraulic cabinet <br />ii -Conversion Frame 3-25-08 <br />