Laserfiche WebLink
INSTALLATION MATERIALS CHECKLIST <br />❑ <br />Tools & Equipment <br />❑ <br />Offsets, elbows, nipples, unions, Etc.. <br />❑ <br />Concrete Anchor Bolts * <br />❑ <br />Plastic caps (sow plugs) for nuts / bolts <br />* S. Bravo Systems, Inc. does not include Concrete Anchor Bolts with its Conversion Frames. <br />PRE -INSTALLATION CHECKLIST <br />❑ Ensure that you have all your permits in order, including your Bravo Certification Card. <br />❑ Conversion Frame is free of damage? <br />❑ Physically check the Dispenser, Sump and Conversion Frame drawings before installation? <br />❑ NO modification to the Conv-Frame is necessary? If so, Call 323-888-4133 immediately. <br />INSTALLATION CHECKLIST <br />❑ Dispenser was carefully removed and any spills contained? <br />❑ Drawings for all components are on-site and have been reviewed for any problems? <br />❑ Conversion Frame is securely bolted to the existing UDC Sump with minimum 1/2" bolts? <br />❑ If OPP or a Non -Bravo Systems UDC is existing, were a minimum of 4 anchor bolts <br />securely installed directly to the concrete? <br />❑ All electrical conduits are adjusted correctly to mate with the new dispenser? <br />❑ All product inlets are pre -plumbed with approved offsets, elbows, pipe, etc..? <br />❑ Conversion Frame was inspected for dents or damage? <br />❑ Dispenser was carefully lined up and securely bolted to the Conversion Frame? <br />4 ii -Conversion Frame 3-25-08 <br />