Laserfiche WebLink
SWRCB. January 2002 <br />4. SPILL/OVERFILL CONTAINMENT BOXES — <br />Page I- <br />-7 of,;;, <br />Facility is Not Equipped With Spill/Overfill Containment Boxes 11 <br />Spill/Overfill Containment Boxes are Present, but were Not Tested 0 <br />Test Method Developed By: 0 Spill Bucket Manufacturer Industry Standard 11 Professional Engineer <br />11 Other (Specify) <br />Test Method Used: 0 Pressure 11 Vacuum 11 Hydrostatic <br />0 Other (Speczj�) <br />Test Equipment Used: Equipment Resolution: <br />Spill Spill Box spin Box <br />Box # #,4; Spill Box <br />Bucket Diameter: <br />Bucket Depth: <br />13 <br />Wait time between applying <br />pressureA-acuum/water and <br />starting test: <br />-171 <br />Test Start Time: <br />Initial Reading W: <br />Test End Time: <br />Final Reading (RF):z <br />2- <:f) <br />6 <br />Test ration: <br />/izl" <br />Change in Reading (RF -RI): <br />Pass/Fad Tbreshold or <br />Criteria: <br />Test Result: <br />19 Pass 0 Fail <br />II Pam 0 Fad <br />S Pass 0 Fail <br />0 Pass 0 Fail <br />Comments — (include information on repairs made prior to resting, and recommended follow-up for failed tests) <br />