Laserfiche WebLink
Reverse Ratio Piston / Poppet Combination <br />Reverse Ratio means the leak detector has a smaller diameter piston area than the poppet it is attached to. <br />This smaller piston area keeps the leak detector in the fast fill position (3 GPM) to a higher line pressure while <br />compressing vapor pockets and expanding flexible pipes faster. This means less time to full flow. The leak <br />detector does not have to completely reset (as with competitive leak detectors) for the poppet to be forced <br />into the reset mode at pump start-up. <br />Smaller Volume / Faster Response Piston Size <br />With a reduced piston size, there is one-fourth the fuel volume to replace when in leak search and one-fourth <br />the fuel volume to return to the line when the pump turns off. This combination makes for a more responsive <br />and faster leak detector. Less volume to leave the line for the leak detector to reset and catch leaks. Less <br />volume to fill and provide full flow for dispensing! <br />Superior Flex -Pipe Performance <br />The reduced surface area of the piston significantly reduces the surface area exposed to hydraulic line <br />shock. This results in enhanced performance with steel and fiberglass pipe, and especially with today's <br />flexible pipe. <br />99 LD -2000\E <br />In the early 1990's, the first commercially successful flexible pipe, Total Containment PP -1500, was introduced <br />to the U. S. petroleum industry. Due to the flexibility of this pipe system, no line leak detection would work. <br />In 1992, the Vmi LD -2000\E was certified for 3 GPH @ 10 PSI on Total Containment PP -1500 pipe. The <br />99 LD -2000\E is still required for existing PP -1500 pipe. Additionally, today the 99 LD -2000\E is used in <br />sites that have the same line characteristics as the LD -2000\E was originally certified for, even though the <br />pipe is different. The original certification of the LD -2000\E concerned the bleed -back modulus of PP -1500 <br />pipe. Today, lines with high bleed -back (generally above 600 ml.) and high head pressure may require the <br />99 LD -2000\E to pass a field test for annual certification. Consult with factory before ordering and installing <br />the 99 LD -2000\E. <br />Electronic Line Leak Detection Upgrade! <br />The 99 LD -2000 may be upgraded in the field to eliminate thermal induced slow -flow, provide submersible <br />shut -down, and alarm notification to site monitoring equipment. Request information on the ISM -4080, an easy <br />upgrade for existing or new installations. The ISM -4080 also stages turbines and controls solenoid valves for <br />loading racks and marine applications. If there is no need for staged turbines, solenoid valve control, alarm <br />notification or submersible shut -down, request information on the ARM -4073 to eliminate false alarms only. <br />