My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004 - 2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1399
>
2300 - Underground Storage Tank Program
>
PR0231464
>
COMPLIANCE INFO 2004 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2019 11:58:25 AM
Creation date
12/13/2018 3:43:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2012
RECORD_ID
PR0231464
PE
2361
FACILITY_ID
FA0000914
FACILITY_NAME
TIGER EXPRESS STORES
STREET_NUMBER
1399
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1399 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
456
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />1868 East Hazelton Avenue, Stockton, California 95205-6232 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sigov.org/ehd <br />UNDERGROUND STORAGE TANK (UST) PROGRAM INSPECTION REPORT CONTINUED <br />Facility Facility Inspection <br />Name: Tiger Express Address: 1399 Yosemite Avenue, Manteca pate: Jun 28, 2012 <br />SUMMARY OF VIOLATIONS <br />CLASS I, CLASS II, or MINOR -Notice to Comply) <br />104. Financial responsibility documents have not been submitted to the EHD. Current financial <br />responsibility documents are required to be submitted annually. Complete and submit a copy of the <br />financial responsibility to the EHD within 30 days of receiving this report. <br />105. UST facility and tank forms on file with the EHD are not current. Any change of information on <br />these forms must be submitted to the EHD within 30 days of the changes. Immediately complete and <br />submit a copy of the facility and tank forms to the EHD. Complete a separate tank form for each tank. <br />106 & 202. Current approved copies of the monitoring and response plans were not found on site. The <br />monitoring and response plans must be current and approved by the EHD. Complete and submit a copy <br />of the monitoring and response plans for approval by the EHD within 30 days of receiving this report. An <br />approved copy will be returned for your records. <br />108. Secondary containment testing was last performed on 1/23/09 and was due by 1/2312. Testing <br />has not been completed and is 5 months past due. Secondary containment testing is required once <br />every 36 months. Immediately schedule this test and provide 48 hours notification to the EHD. <br />109, 110, & 111. Annual monitoring system certification, leak detector testing, and spill container testing <br />were last performed on 2/25/11 and was due by 2/25/12. Testing has not been completed and is 4 <br />months past due. These tests are required once every 12 months. Immediately schedule these tests <br />and provide 48 hours notification to the EHD. Please be aware that a follow up inspection will be <br />charged at our current hourly rate. <br />113. Facility lack designated operator. By January1, 2005, owners of UST systems shall submit a <br />signed statement to the local agency indicating that the owner understands and is in compliance with the <br />applicable UST requirements, and identifying the designated UST operator for each facility owned. <br />Submit notification to the EHD identifying all the designated operators for this facility immediately. <br />ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY RATE. <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br />Inspector. Received By: Title: <br />v✓l - n/q� /yw I�-Zc,,.,(. j qtr V'1V . a, /14) <br />EHD 23-02 Rev 04/19/12 Page 3 UST INSPECTION REPORT <br />VIOLATIONS <br /># <br />C1 <br />C2 <br />M <br />Code Section <br />HSC = CA Health and Safety Code: CFR = Code of Federal Regulations <br />C1 = Class 1 violation; C2 = Class 2 violation. M = Minor violation <br />Non -Pressurized Piping (continued) <br />702 <br />CCR 2643(e) <br />Biennial tightness test of gravity piping not performed (pre -January 1, 1984) (M1) <br />703 <br />CCR 2643(d) <br />Triennial line test for conventional suction piping not performed (pre -January 1, 1984) (M1) <br />Other Violations <br />999 <br />Other: <br />See attached "Continuation — Official Inspection Report" for violation(s) not listed above. <br />SUMMARY OF VIOLATIONS <br />CLASS I, CLASS II, or MINOR -Notice to Comply) <br />104. Financial responsibility documents have not been submitted to the EHD. Current financial <br />responsibility documents are required to be submitted annually. Complete and submit a copy of the <br />financial responsibility to the EHD within 30 days of receiving this report. <br />105. UST facility and tank forms on file with the EHD are not current. Any change of information on <br />these forms must be submitted to the EHD within 30 days of the changes. Immediately complete and <br />submit a copy of the facility and tank forms to the EHD. Complete a separate tank form for each tank. <br />106 & 202. Current approved copies of the monitoring and response plans were not found on site. The <br />monitoring and response plans must be current and approved by the EHD. Complete and submit a copy <br />of the monitoring and response plans for approval by the EHD within 30 days of receiving this report. An <br />approved copy will be returned for your records. <br />108. Secondary containment testing was last performed on 1/23/09 and was due by 1/2312. Testing <br />has not been completed and is 5 months past due. Secondary containment testing is required once <br />every 36 months. Immediately schedule this test and provide 48 hours notification to the EHD. <br />109, 110, & 111. Annual monitoring system certification, leak detector testing, and spill container testing <br />were last performed on 2/25/11 and was due by 2/25/12. Testing has not been completed and is 4 <br />months past due. These tests are required once every 12 months. Immediately schedule these tests <br />and provide 48 hours notification to the EHD. Please be aware that a follow up inspection will be <br />charged at our current hourly rate. <br />113. Facility lack designated operator. By January1, 2005, owners of UST systems shall submit a <br />signed statement to the local agency indicating that the owner understands and is in compliance with the <br />applicable UST requirements, and identifying the designated UST operator for each facility owned. <br />Submit notification to the EHD identifying all the designated operators for this facility immediately. <br />ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY RATE. <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br />Inspector. Received By: Title: <br />v✓l - n/q� /yw I�-Zc,,.,(. j qtr V'1V . a, /14) <br />EHD 23-02 Rev 04/19/12 Page 3 UST INSPECTION REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.