My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1245
>
2300 - Underground Storage Tank Program
>
PR0541906
>
INSTALL_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2023 4:03:26 PM
Creation date
12/13/2018 4:57:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2019
RECORD_ID
PR0541906
PE
2351
FACILITY_ID
FA0024040
FACILITY_NAME
MANTECA CHEVRON
STREET_NUMBER
1245
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1245 N MAIN ST
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
621
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN_JOAQUIN <br />COUNTY <br />Environmental Health Department <br />to the Site Mitigation Unit for review. For further assistance contact the Site <br />Mitigation Unit at (209) 468-3450. <br />B. PLAN REVIEW AND OPERATING PERMIT FEES <br />1. New facility plan review fee of $1,216.00 (8 hour minimum per facility). Also due at <br />time of plan submittal: $641.00 facility fee, $152.00 per tank fee plus $20.00 state <br />surcharge fee per tank. Facilities not already on inventory in a CUPA program have <br />an additional $49.00 per site state surcharge. <br />2. New installation of an additional tank at an existing facility is $1,216.00 plan review <br />fee (8 hour minimum per facility) plus $152.00 per new tank, and $20.00 per new <br />tank state surcharge fee. <br />3. It should be noted that a $1,216.00 plan review check fee required for each <br />submittal allows for up to eight (8) hours of staff review and/or inspection time. <br />Additional time spent on plan review, meetings, inspections, phone or office <br />consultations will be billed to the applicant at a rate of $152.00 per hour. <br />4. The maximum review time for UST installation plans is 40 working days. A <br />preliminary review will be conducted by the EHD within 20 working days of submittal <br />date to identify any gross plan deficiencies. <br />5. If gross deficiencies are identified, the plans will be returned with a checklist <br />identifying plan deficiencies. <br />6. To expedite the review of installation plans, time and a half per hour overtime fee may <br />be submitted to have review completed within 10 working days of submittal date if staff <br />is available to perform the review. <br />2 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.