Laserfiche WebLink
WALLET CARD (Wall Certificate — Page 2) <br /> O P VVI. Installer Attestation No.P 100471 <br /> ° °°"�° `°�°A"" Steve Jones <br /> VR-102-UST <br /> MVP Petroleum Engineering-Folsom <br /> Attended Installation Training for EVR Phase I by OPW,Inc. <br /> On: Feb 17, 2017 exp nate: Feb 18, 2019 <br /> Completion of this training course does not create a warranty or guaranty by OPW of your installation <br /> and/or maintenance of nozzles,vapor recovery systems and EVR PHASE I systems,This training <br /> course does not eliminate the need to strictly adhere to manufacturer Instructions and procedures <br /> when installing and maintaining nozzles,vapor recovery systems and EVR PHASE I Systems.All <br /> nozzles,vapor recovery systems and EVR PHASE I Systems must be Installed and maintained in <br /> accordance with manufacturer Instructions and procedures.Attestation applies ONLY to tested named <br /> Individual. <br /> t•� �z <br /> ;e <br /> r, la ! ti t <br /> fM ­€ <br /> 4 <br /> 69 <br /> f CIA <br />